FHWA NBI 2024 Inspection record Public-domain dataset

WALLUSKI LP ROAD

Carrying WALLUSKI LP ROAD over WALLOOSKEE RIVER

015 MI NW OF OLNEY, Clatsop, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
32 t Inventory load rating

Bridge Snapshot: WALLUSKI LP ROAD

The WALLUSKI LP ROAD bridge in Clatsop, Oregon carries WALLUSKI LP ROAD over WALLOOSKEE RIVER. It was built in 1988, making it 38 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 31.7 meters (104 feet) end to end. Daily traffic averages 450 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How WALLUSKI LP ROAD compares

▲ 0.1
Load rating vs Oregon average (32.3 t)
Top 45%
Higher load rating than 55% of Oregon bridges
155
Bridges in Clatsop · 5 in Poor condition
WALLUSKI LP ROAD 32.4 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
94.2 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
27.3
Essentiality /15
14.8
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1988
Material
Prestressed Concrete
Number of Spans
3
Structure Length
31.7 m (104 ft)
Deck Width
8.5 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
450 vehicles/day
Structure Number
11160A060100299

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether WALLUSKI LP ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WALLUSKI LP ROAD against other structures in Clatsop and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WALLUSKI LP ROAD?

WALLUSKI LP ROAD in Clatsop, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is WALLUSKI LP ROAD inspected?

WALLUSKI LP ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 450 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WALLUSKI LP ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WALLUSKI LP ROAD?

WALLUSKI LP ROAD has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining WALLUSKI LP ROAD?

WALLUSKI LP ROAD is owned and maintained by County Highway Agency.

How old is WALLUSKI LP ROAD and does age affect safety?

WALLUSKI LP ROAD was built in 1988, making it 38 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.