FHWA NBI 2024 Inspection record Public-domain dataset

SH 332 ON RP

Carrying SH 332 ON RP over DITCH

4 MI. E JCT FM523 & SH332, Brazoria, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
33 t Inventory load rating

Bridge Snapshot: SH 332 ON RP

The SH 332 ON RP bridge in Brazoria, Texas carries SH 332 ON RP over DITCH. It was built in 1998, making it 28 years old today. The structure is built primarily of prestressed concrete and spans 13 sections, stretching 198.7 meters (652 feet) end to end. Daily traffic averages 5,520 vehicles, placing it in the moderately-trafficked tier of Texas bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SH 332 ON RP compares

▲ 4.4
Load rating vs Texas average (28.3 t)
Top 40%
Higher load rating than 60% of Texas bridges
618
Bridges in Brazoria · 14 in Poor condition
SH 332 ON RP 32.7 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
80.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
0.0
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1998
Material
Prestressed Concrete
Number of Spans
13
Structure Length
198.7 m (652 ft)
Deck Width
7.9 m (26 ft)
Owner
State Highway Agency
Avg Daily Traffic
5,520 vehicles/day
Structure Number
120200058601012

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether SH 332 ON RP is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SH 332 ON RP against other structures in Brazoria and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SH 332 ON RP?

SH 332 ON RP in Brazoria, Texas has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SH 332 ON RP inspected?

SH 332 ON RP's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,520 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SH 332 ON RP is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SH 332 ON RP?

SH 332 ON RP has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining SH 332 ON RP?

SH 332 ON RP is owned and maintained by State Highway Agency.

How old is SH 332 ON RP and does age affect safety?

SH 332 ON RP was built in 1998, making it 28 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.