FHWA NBI 2024 Inspection record Public-domain dataset

RIDGECREEK DR EB

Carrying RIDGECREEK DR EB over HCFCD DITCH

0.15 MI E OF S POST OAK, Fort Bend, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
25 t Inventory load rating

Bridge Snapshot: RIDGECREEK DR EB

The RIDGECREEK DR EB bridge in Fort Bend, Texas carries RIDGECREEK DR EB over HCFCD DITCH. It was built in 1972, making it 54 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 24.1 meters (79 feet) end to end. Daily traffic averages 3,430 vehicles, placing it in the moderately-trafficked tier of Texas bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 24.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How RIDGECREEK DR EB compares

▼ 3.8
Load rating vs Texas average (28.3 t)
Bottom 29%
Lower load rating than 71% of Texas bridges
796
Bridges in Fort Bend · 21 in Poor condition
RIDGECREEK DR EB 24.5 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
70.3 / 100 - historical 50–79.9 band
Structural adequacy /55
47.8
Serviceability /30
11.0
Essentiality /15
14.5
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1972
Material
Prestressed Concrete
Number of Spans
3
Structure Length
24.1 m (79 ft)
Deck Width
8.6 m (28 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
3,430 vehicles/day
Structure Number
120800B54300001

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether RIDGECREEK DR EB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare RIDGECREEK DR EB against other structures in Fort Bend and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for RIDGECREEK DR EB?

RIDGECREEK DR EB in Fort Bend, Texas has a deck rating of 6/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is RIDGECREEK DR EB inspected?

RIDGECREEK DR EB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 3,430 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. RIDGECREEK DR EB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for RIDGECREEK DR EB?

RIDGECREEK DR EB has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining RIDGECREEK DR EB?

RIDGECREEK DR EB is owned and maintained by City/Municipal Highway Agency.

How old is RIDGECREEK DR EB and does age affect safety?

RIDGECREEK DR EB was built in 1972, making it 54 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.