FHWA NBI 2024 Inspection record Public-domain dataset

Madera Run Pkwy WB

Carrying Madera Run Pkwy WB over Groves Drainage Channel

1.0 Mi SW of W Lk Houston, Harris, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
33 t Inventory load rating

Bridge Snapshot: Madera Run Pkwy WB

The Madera Run Pkwy WB bridge in Harris, Texas carries Madera Run Pkwy WB over Groves Drainage Channel. It was built in 2017, making it 9 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 25.3 meters (83 feet) end to end. Daily traffic averages 1,000 vehicles, placing it in the lower-traffic tier of Texas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Madera Run Pkwy WB compares

▲ 4.4
Load rating vs Texas average (28.3 t)
Top 40%
Higher load rating than 60% of Texas bridges
4,030
Bridges in Harris · 18 in Poor condition
Madera Run Pkwy WB 32.7 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
78.9 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
14.9
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2017
Material
Prestressed Concrete
Number of Spans
1
Structure Length
25.3 m (83 ft)
Deck Width
10.8 m (35 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,000 vehicles/day
Structure Number
121020A62337020

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether Madera Run Pkwy WB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Madera Run Pkwy WB against other structures in Harris and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Madera Run Pkwy WB?

Madera Run Pkwy WB in Harris, Texas has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is Madera Run Pkwy WB inspected?

Madera Run Pkwy WB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Madera Run Pkwy WB is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Madera Run Pkwy WB?

Madera Run Pkwy WB has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining Madera Run Pkwy WB?

Madera Run Pkwy WB is owned and maintained by County Highway Agency.

How old is Madera Run Pkwy WB and does age affect safety?

Madera Run Pkwy WB was built in 2017, making it 9 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.