FHWA NBI 2024 Inspection record Public-domain dataset

PARK ST

Carrying PARK ST over GOOSE CREEK

0.1 MI E OF SPUR 330, Harris, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
25 t Inventory load rating

Bridge Snapshot: PARK ST

The PARK ST bridge in Harris, Texas carries PARK ST over GOOSE CREEK. It was built in 1991, making it 35 years old today. The structure is built primarily of prestressed concrete and spans 5 sections, stretching 64.0 meters (210 feet) end to end. Daily traffic averages 2,200 vehicles, placing it in the moderately-trafficked tier of Texas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 24.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PARK ST compares

▼ 3.8
Load rating vs Texas average (28.3 t)
Bottom 29%
Lower load rating than 71% of Texas bridges
4,030
Bridges in Harris · 18 in Poor condition
PARK ST 24.5 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
90.4 / 100 - historical 80–100 band
Structural adequacy /55
47.8
Serviceability /30
30.0
Essentiality /15
14.7
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1991
Material
Prestressed Concrete
Number of Spans
5
Structure Length
64.0 m (210 ft)
Deck Width
13.1 m (43 ft)
Owner
County Highway Agency
Avg Daily Traffic
2,200 vehicles/day
Structure Number
121020AA1880001

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether PARK ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PARK ST against other structures in Harris and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PARK ST?

PARK ST in Harris, Texas has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PARK ST inspected?

PARK ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PARK ST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PARK ST?

PARK ST has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining PARK ST?

PARK ST is owned and maintained by County Highway Agency.

How old is PARK ST and does age affect safety?

PARK ST was built in 1991, making it 35 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.