DANIELS PKWY/CR876
Carrying DANIELS PKWY/CR876 over TEN MILE CANAL
1.0 MI EAST OF US-41, Lee, Florida
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: DANIELS PKWY/CR876
The DANIELS PKWY/CR876 bridge in Lee, Florida carries DANIELS PKWY/CR876 over TEN MILE CANAL. It was built in 1978, making it 48 years old today. It was last reconstructed in 1990, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 32.0 meters (105 feet) end to end. Daily traffic averages 48,300 vehicles, placing it in the heavily-trafficked tier of Florida bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 42.2 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How DANIELS PKWY/CR876 compares
Live comparison across Florida.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1978
- Last Reconstructed
- 1990
- Material
- Prestressed Concrete
- Number of Spans
- 3
- Structure Length
- 32.0 m (105 ft)
- Deck Width
- 19.5 m (64 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 48,300 vehicles/day
- Structure Number
- 124013
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
- • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
- • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.
How to read this record
This page shows what the last federal inspection recorded, not whether DANIELS PKWY/CR876 is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare DANIELS PKWY/CR876 against other structures in Lee and across Florida. Florida bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for DANIELS PKWY/CR876?
DANIELS PKWY/CR876 in Lee, Florida has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.
How often is DANIELS PKWY/CR876 inspected?
DANIELS PKWY/CR876's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 48,300 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. DANIELS PKWY/CR876 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for DANIELS PKWY/CR876?
DANIELS PKWY/CR876 has an NBI inventory load rating of 42.2 metric tons.
Who is responsible for maintaining DANIELS PKWY/CR876?
DANIELS PKWY/CR876 is owned and maintained by County Highway Agency.
How old is DANIELS PKWY/CR876 and does age affect safety?
DANIELS PKWY/CR876 was built in 1978, making it 48 years old and last reconstructed in 1990.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.