FHWA NBI 2024 Inspection record Public-domain dataset

ORCHARD RD

Carrying ORCHARD RD over BR OF PARKS CR

S 20 T 31 N R 15 W, Wright, Missouri

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
24 t Inventory load rating

Bridge Snapshot: ORCHARD RD

The ORCHARD RD bridge in Wright, Missouri carries ORCHARD RD over BR OF PARKS CR. It was built in 1988, making it 38 years old today. The structure is built primarily of concrete continuous and spans 2 sections, stretching 7.3 meters (24 feet) end to end. Daily traffic averages 30 vehicles, placing it in the lower-traffic tier of Missouri bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 24.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ORCHARD RD compares

▼ 9.4
Load rating vs Missouri average (33.7 t)
Bottom 30%
Lower load rating than 70% of Missouri bridges
131
Bridges in Wright · 13 in Poor condition
ORCHARD RD 24.3 t
Missouri average 33.7 t

Live comparison across Missouri.

Historical Sufficiency Rating

PlainBridge-computed
91.5 / 100 - historical 80–100 band
Structural adequacy /55
47.5
Serviceability /30
29.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
24.3 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1988
Material
Concrete Continuous
Number of Spans
2
Structure Length
7.3 m (24 ft)
Deck Width
6.2 m (20 ft)
Owner
County Highway Agency
Avg Daily Traffic
30 vehicles/day
Structure Number
12503

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether ORCHARD RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ORCHARD RD against other structures in Wright and across Missouri. Missouri bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ORCHARD RD?

ORCHARD RD in Wright, Missouri has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is ORCHARD RD inspected?

ORCHARD RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 30 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ORCHARD RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ORCHARD RD?

ORCHARD RD has an NBI inventory load rating of 24.3 metric tons.

Who is responsible for maintaining ORCHARD RD?

ORCHARD RD is owned and maintained by County Highway Agency.

How old is ORCHARD RD and does age affect safety?

ORCHARD RD was built in 1988, making it 38 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.