FHWA NBI 2024 Inspection record Public-domain dataset

TROPICANA PARKWAY

Carrying TROPICANA PARKWAY over VERMONT CANAL

0.25MI Wof ANDALUSIA BLVD, Lee, Florida

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
26 t Inventory load rating

Bridge Snapshot: TROPICANA PARKWAY

The TROPICANA PARKWAY bridge in Lee, Florida carries TROPICANA PARKWAY over VERMONT CANAL. It was built in 1970, making it 56 years old today. The structure is built primarily of concrete and spans 3 sections, stretching 14.9 meters (49 feet) end to end. Daily traffic averages 4,300 vehicles, placing it in the moderately-trafficked tier of Florida bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 25.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How TROPICANA PARKWAY compares

▼ 13.2
Load rating vs Florida average (38.9 t)
Bottom 16%
Lower load rating than 84% of Florida bridges
391
Bridges in Lee · 3 in Poor condition
TROPICANA PARKWAY 25.7 t
Florida average 38.9 t

Live comparison across Florida.

Historical Sufficiency Rating

PlainBridge-computed
73.5 / 100 - historical 50–79.9 band
Structural adequacy /55
49.4
Serviceability /30
13.0
Essentiality /15
14.2
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
25.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1970
Material
Concrete
Number of Spans
3
Structure Length
14.9 m (49 ft)
Deck Width
20.3 m (67 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
4,300 vehicles/day
Structure Number
125568

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether TROPICANA PARKWAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare TROPICANA PARKWAY against other structures in Lee and across Florida. Florida bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for TROPICANA PARKWAY?

TROPICANA PARKWAY in Lee, Florida has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is TROPICANA PARKWAY inspected?

TROPICANA PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,300 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. TROPICANA PARKWAY is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for TROPICANA PARKWAY?

TROPICANA PARKWAY has an NBI inventory load rating of 25.7 metric tons.

Who is responsible for maintaining TROPICANA PARKWAY?

TROPICANA PARKWAY is owned and maintained by City/Municipal Highway Agency.

How old is TROPICANA PARKWAY and does age affect safety?

TROPICANA PARKWAY was built in 1970, making it 56 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.