FHWA NBI 2024 Inspection record Public-domain dataset

GILKEY ROAD

Carrying GILKEY ROAD over DITCH

0129 MI N CRABTREE, Linn, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
46 t Inventory load rating

Bridge Snapshot: GILKEY ROAD

The GILKEY ROAD bridge in Linn, Oregon carries GILKEY ROAD over DITCH. It was built in 1978, making it 48 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 7.3 meters (24 feet) end to end. Daily traffic averages 618 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 46.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How GILKEY ROAD compares

▲ 14.0
Load rating vs Oregon average (32.3 t)
Top 16%
Higher load rating than 84% of Oregon bridges
567
Bridges in Linn · 100 in Poor condition
GILKEY ROAD 46.3 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
96.6 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.6
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
46.3 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1978
Material
Prestressed Concrete
Number of Spans
1
Structure Length
7.3 m (24 ft)
Deck Width
11.0 m (36 ft)
Owner
County Highway Agency
Avg Daily Traffic
618 vehicles/day
Structure Number
12804A007A00129

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether GILKEY ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare GILKEY ROAD against other structures in Linn and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GILKEY ROAD?

GILKEY ROAD in Linn, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is GILKEY ROAD inspected?

GILKEY ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 618 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GILKEY ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GILKEY ROAD?

GILKEY ROAD has an NBI inventory load rating of 46.3 metric tons.

Who is responsible for maintaining GILKEY ROAD?

GILKEY ROAD is owned and maintained by County Highway Agency.

How old is GILKEY ROAD and does age affect safety?

GILKEY ROAD was built in 1978, making it 48 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.