FHWA NBI 2024 Inspection record Public-domain dataset

CHRISTINA PARKWAY

Carrying CHRISTINA PARKWAY over AMTRAK & CONRAIL

NEWARK, New Castle, Delaware

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
41 t Inventory load rating

Bridge Snapshot: CHRISTINA PARKWAY

The CHRISTINA PARKWAY bridge in New Castle, Delaware carries CHRISTINA PARKWAY over AMTRAK & CONRAIL. It was built in 1980, making it 46 years old today. The structure is built primarily of steel continuous and spans 4 sections, stretching 115.2 meters (378 feet) end to end. Daily traffic averages 36,174 vehicles, placing it in the heavily-trafficked tier of Delaware bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 40.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CHRISTINA PARKWAY compares

▲ 1.0
Load rating vs Delaware average (39.5 t)
Top 40%
Higher load rating than 60% of Delaware bridges
533
Bridges in New Castle · 5 in Poor condition
CHRISTINA PARKWAY 40.5 t
Delaware average 39.5 t

Live comparison across Delaware.

Historical Sufficiency Rating

PlainBridge-computed
77.8 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
14.0
Essentiality /15
10.8
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
40.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1980
Material
Steel Continuous
Number of Spans
4
Structure Length
115.2 m (378 ft)
Deck Width
17.4 m (57 ft)
Owner
State Highway Agency
Avg Daily Traffic
36,174 vehicles/day
Structure Number
1282 366

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 6/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether CHRISTINA PARKWAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CHRISTINA PARKWAY against other structures in New Castle and across Delaware. Delaware bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CHRISTINA PARKWAY?

CHRISTINA PARKWAY in New Castle, Delaware has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CHRISTINA PARKWAY inspected?

CHRISTINA PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 36,174 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CHRISTINA PARKWAY is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CHRISTINA PARKWAY?

CHRISTINA PARKWAY has an NBI inventory load rating of 40.5 metric tons.

Who is responsible for maintaining CHRISTINA PARKWAY?

CHRISTINA PARKWAY is owned and maintained by State Highway Agency.

How old is CHRISTINA PARKWAY and does age affect safety?

CHRISTINA PARKWAY was built in 1980, making it 46 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.