FHWA NBI 2024 Inspection record Public-domain dataset

CANA HWY

Carrying CANA HWY over PINE CREEK

4 MI W/O SR 99, Butte, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
31 t Inventory load rating

Bridge Snapshot: CANA HWY

The CANA HWY bridge in Butte, California carries CANA HWY over PINE CREEK. It was built in 1921, making it 105 years old today. The structure is built primarily of concrete continuous and spans 5 sections, stretching 46.5 meters (153 feet) end to end. Daily traffic averages 276 vehicles, placing it in the lower-traffic tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 30.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CANA HWY compares

▼ 0.8
Load rating vs California average (31.3 t)
Bottom 38%
Lower load rating than 62% of California bridges
441
Bridges in Butte · 26 in Poor condition
CANA HWY 30.5 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
49.7 / 100 - historical 20–49.9 band
Structural adequacy /55
29.1
Serviceability /30
11.0
Essentiality /15
9.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
30.5 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1921
Material
Concrete Continuous
Number of Spans
5
Structure Length
46.5 m (153 ft)
Deck Width
7.0 m (23 ft)
Owner
County Highway Agency
Avg Daily Traffic
276 vehicles/day
Structure Number
12C0301

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

CANA HWY is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CANA HWY against other structures in Butte and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CANA HWY?

CANA HWY in Butte, California has a deck rating of 6/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is CANA HWY inspected?

CANA HWY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 276 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CANA HWY is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CANA HWY?

CANA HWY has an NBI inventory load rating of 30.5 metric tons.

Who is responsible for maintaining CANA HWY?

CANA HWY is owned and maintained by County Highway Agency.

How old is CANA HWY and does age affect safety?

CANA HWY was built in 1921, making it 105 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.