FHWA NBI 2024 Inspection record Public-domain dataset

SPEEDY ROAD

Carrying SPEEDY ROAD over MITCHELL CREEK

0.00 S OF MITCHELL CR. RD, Crawford, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
33 t Inventory load rating

Bridge Snapshot: SPEEDY ROAD

The SPEEDY ROAD bridge in Crawford, Indiana carries SPEEDY ROAD over MITCHELL CREEK. It was built in 1933, making it 93 years old today. It was last reconstructed in 1998, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 8.9 meters (29 feet) end to end. Daily traffic averages 141 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SPEEDY ROAD compares

▼ 2.9
Load rating vs Indiana average (35.6 t)
Bottom 36%
Lower load rating than 64% of Indiana bridges
117
Bridges in Crawford · 19 in Poor condition
SPEEDY ROAD 32.7 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
82.2 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
15.2
Essentiality /15
14.9
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1933
Last Reconstructed
1998
Material
Steel
Number of Spans
1
Structure Length
8.9 m (29 ft)
Deck Width
4.8 m (16 ft)
Owner
County Highway Agency
Avg Daily Traffic
141 vehicles/day
Structure Number
1300060

Condition Analysis

  • The deck (driving surface) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether SPEEDY ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SPEEDY ROAD against other structures in Crawford and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SPEEDY ROAD?

SPEEDY ROAD in Crawford, Indiana has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SPEEDY ROAD inspected?

SPEEDY ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 141 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SPEEDY ROAD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SPEEDY ROAD?

SPEEDY ROAD has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining SPEEDY ROAD?

SPEEDY ROAD is owned and maintained by County Highway Agency.

How old is SPEEDY ROAD and does age affect safety?

SPEEDY ROAD was built in 1933, making it 93 years old and last reconstructed in 1998.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.