FHWA NBI 2024 Inspection record Public-domain dataset

Ireton Trees

Carrying Ireton Trees over NORTH FORK

1.25 MI E. OF INT SR32, Clermont, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
5 t Inventory load rating

Bridge Snapshot: Ireton Trees

The Ireton Trees bridge in Clermont, Ohio carries Ireton Trees over NORTH FORK. It was built in 2004, making it 22 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 21.6 meters (71 feet) end to end. Daily traffic averages 324 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 3/9, substructure at 9/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 5.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Ireton Trees compares

▼ 32.3
Load rating vs Ohio average (37.5 t)
Bottom 1%
Lower load rating than 99% of Ohio bridges
319
Bridges in Clermont · 26 in Poor condition
Ireton Trees 5.2 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
13.8 / 100 - historical under-20 band
Structural adequacy /55
0.0
Serviceability /30
2.0
Essentiality /15
11.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
3/9
Poor (1–4)
Substructure
9/9
Good (7–9)
Inventory Load Rating
5.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2004
Material
Prestressed Concrete
Number of Spans
1
Structure Length
21.6 m (71 ft)
Deck Width
7.3 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
324 vehicles/day
Structure Number
1333518

Condition Analysis

  • At 3/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • At 3/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) is in good condition (9/9), showing no significant deterioration.

How to read this record

Ireton Trees is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare Ireton Trees against other structures in Clermont and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Ireton Trees?

Ireton Trees in Clermont, Ohio has a deck rating of 3/9, superstructure rating of 3/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is Ireton Trees inspected?

Ireton Trees's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 324 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Ireton Trees is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Ireton Trees?

Ireton Trees has an NBI inventory load rating of 5.2 metric tons.

Who is responsible for maintaining Ireton Trees?

Ireton Trees is owned and maintained by County Highway Agency.

How old is Ireton Trees and does age affect safety?

Ireton Trees was built in 2004, making it 22 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.