FHWA NBI 2024 Inspection record Public-domain dataset

MILLER RD

Carrying MILLER RD over SMALLMAN CREEK

009 MI N CR 5, Linn, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
10 t Inventory load rating

Bridge Snapshot: MILLER RD

The MILLER RD bridge in Linn, Oregon carries MILLER RD over SMALLMAN CREEK. It was built in 1950, making it 76 years old today. The structure is built primarily of wood or timber and spans 5 sections, stretching 29.6 meters (97 feet) end to end. Daily traffic averages 15 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 3/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 10.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How MILLER RD compares

▼ 22.3
Load rating vs Oregon average (32.3 t)
Bottom 2%
Lower load rating than 98% of Oregon bridges
567
Bridges in Linn · 100 in Poor condition
MILLER RD 10.0 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
40.5 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
26.0
Essentiality /15
14.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
3/9
Poor (1–4)
Inventory Load Rating
10.0 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1950
Material
Wood or Timber
Number of Spans
5
Structure Length
29.6 m (97 ft)
Deck Width
5.6 m (18 ft)
Owner
County Highway Agency
Avg Daily Traffic
15 vehicles/day
Structure Number
14012 061700092

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) is in poor condition (3/9), showing advanced deterioration that may require priority repair.

How to read this record

MILLER RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare MILLER RD against other structures in Linn and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for MILLER RD?

MILLER RD in Linn, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 3/9 on the FHWA's 0–9 scale.

How often is MILLER RD inspected?

MILLER RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 15 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. MILLER RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for MILLER RD?

MILLER RD has an NBI inventory load rating of 10.0 metric tons.

Who is responsible for maintaining MILLER RD?

MILLER RD is owned and maintained by County Highway Agency.

How old is MILLER RD and does age affect safety?

MILLER RD was built in 1950, making it 76 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.