FHWA NBI 2024 Inspection record Public-domain dataset

SH 130 SB ML

Carrying SH 130 SB ML over BRUSHY CREEK

0.80 MI S OF US 79, Williamson, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
41 t Inventory load rating

Bridge Snapshot: SH 130 SB ML

The SH 130 SB ML bridge in Williamson, Texas carries SH 130 SB ML over BRUSHY CREEK. It was built in 2006, making it 20 years old today. The structure is built primarily of prestressed concrete and spans 10 sections, stretching 417.6 meters (1370 feet) end to end. Daily traffic averages 12,500 vehicles, placing it in the heavily-trafficked tier of Texas bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 40.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SH 130 SB ML compares

▲ 12.5
Load rating vs Texas average (28.3 t)
Top 6%
Higher load rating than 94% of Texas bridges
1,171
Bridges in Williamson · 5 in Poor condition
SH 130 SB ML 40.8 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
97.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
13.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
40.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2006
Material
Prestressed Concrete
Number of Spans
10
Structure Length
417.6 m (1370 ft)
Deck Width
16.5 m (54 ft)
Owner
State Highway Agency
Avg Daily Traffic
12,500 vehicles/day
Structure Number
142460044005055

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether SH 130 SB ML is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SH 130 SB ML against other structures in Williamson and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SH 130 SB ML?

SH 130 SB ML in Williamson, Texas has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is SH 130 SB ML inspected?

SH 130 SB ML's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 12,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SH 130 SB ML is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SH 130 SB ML?

SH 130 SB ML has an NBI inventory load rating of 40.8 metric tons.

Who is responsible for maintaining SH 130 SB ML?

SH 130 SB ML is owned and maintained by State Highway Agency.

How old is SH 130 SB ML and does age affect safety?

SH 130 SB ML was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.