FHWA NBI 2024 Inspection record Public-domain dataset

SPRING HILL RD

Carrying SPRING HILL RD over TODDS FORK

.25 MI N OF SR 350, Clinton, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
69 t Inventory load rating

Bridge Snapshot: SPRING HILL RD

The SPRING HILL RD bridge in Clinton, Ohio carries SPRING HILL RD over TODDS FORK. It was built in 1979, making it 47 years old today. It was last reconstructed in 2019, extending its service life. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 63.7 meters (209 feet) end to end. Daily traffic averages 1,172 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 9/9, superstructure at 9/9, substructure at 9/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 69.3 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SPRING HILL RD compares

▲ 31.8
Load rating vs Ohio average (37.5 t)
Top 3%
Higher load rating than 97% of Ohio bridges
209
Bridges in Clinton · 4 in Poor condition
SPRING HILL RD 69.3 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
90.3 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
20.9
Essentiality /15
14.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
9/9
Good (7–9)
Superstructure
9/9
Good (7–9)
Substructure
9/9
Good (7–9)
Inventory Load Rating
69.3 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1979
Last Reconstructed
2019
Material
Prestressed Concrete
Number of Spans
3
Structure Length
63.7 m (209 ft)
Deck Width
8.7 m (29 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,172 vehicles/day
Structure Number
1430114

Condition Analysis

  • The deck (driving surface) is in good condition (9/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (9/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 9/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether SPRING HILL RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SPRING HILL RD against other structures in Clinton and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SPRING HILL RD?

SPRING HILL RD in Clinton, Ohio has a deck rating of 9/9, superstructure rating of 9/9, and substructure rating of 9/9 on the FHWA's 0–9 scale.

How often is SPRING HILL RD inspected?

SPRING HILL RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,172 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SPRING HILL RD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SPRING HILL RD?

SPRING HILL RD has an NBI inventory load rating of 69.3 metric tons.

Who is responsible for maintaining SPRING HILL RD?

SPRING HILL RD is owned and maintained by County Highway Agency.

How old is SPRING HILL RD and does age affect safety?

SPRING HILL RD was built in 1979, making it 47 years old and last reconstructed in 2019.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.