FHWA NBI 2024 Inspection record Public-domain dataset

GILDEA RD

Carrying GILDEA RD over CLEAR CR

S 2150 T 36 N R 2 E, Washington, Missouri

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
12 t Inventory load rating

Bridge Snapshot: GILDEA RD

The GILDEA RD bridge in Washington, Missouri carries GILDEA RD over CLEAR CR. It was built in 1950, making it 76 years old today. It was last reconstructed in 1968, extending its service life. The structure is built primarily of concrete continuous and spans 3 sections, stretching 10.7 meters (35 feet) end to end. Daily traffic averages 35 vehicles, placing it in the lower-traffic tier of Missouri bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 11.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How GILDEA RD compares

▼ 22.0
Load rating vs Missouri average (33.7 t)
Bottom 6%
Lower load rating than 94% of Missouri bridges
158
Bridges in Washington · 16 in Poor condition
GILDEA RD 11.7 t
Missouri average 33.7 t

Live comparison across Missouri.

Historical Sufficiency Rating

PlainBridge-computed
28.1 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
13.3
Essentiality /15
14.8
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
11.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1950
Last Reconstructed
1968
Material
Concrete Continuous
Number of Spans
3
Structure Length
10.7 m (35 ft)
Deck Width
5.4 m (18 ft)
Owner
County Highway Agency
Avg Daily Traffic
35 vehicles/day
Structure Number
15048

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates poor at 4/9, advanced deterioration that should be prioritized for repair.

How to read this record

GILDEA RD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare GILDEA RD against other structures in Washington and across Missouri. Missouri bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GILDEA RD?

GILDEA RD in Washington, Missouri has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is GILDEA RD inspected?

GILDEA RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 35 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GILDEA RD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GILDEA RD?

GILDEA RD has an NBI inventory load rating of 11.7 metric tons.

Who is responsible for maintaining GILDEA RD?

GILDEA RD is owned and maintained by County Highway Agency.

How old is GILDEA RD and does age affect safety?

GILDEA RD was built in 1950, making it 76 years old and last reconstructed in 1968.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.