FHWA NBI 2024 Inspection record Public-domain dataset

PIERCE ROAD

Carrying PIERCE ROAD over GRANDE RONDE RIVER

1.1 MI S OF HWY 82, Union, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
18 t Inventory load rating

Bridge Snapshot: PIERCE ROAD

The PIERCE ROAD bridge in Union, Oregon carries PIERCE ROAD over GRANDE RONDE RIVER. It was built in 1978, making it 48 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 40.2 meters (132 feet) end to end. Daily traffic averages 946 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 17.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PIERCE ROAD compares

▼ 14.5
Load rating vs Oregon average (32.3 t)
Bottom 13%
Lower load rating than 87% of Oregon bridges
167
Bridges in Union · 6 in Poor condition
PIERCE ROAD 17.8 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
69.1 / 100 - historical 50–79.9 band
Structural adequacy /55
36.8
Serviceability /30
19.5
Essentiality /15
14.8
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
17.8 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1978
Material
Prestressed Concrete
Number of Spans
1
Structure Length
40.2 m (132 ft)
Deck Width
9.3 m (31 ft)
Owner
County Highway Agency
Avg Daily Traffic
946 vehicles/day
Structure Number
16317 023 00675

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether PIERCE ROAD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PIERCE ROAD against other structures in Union and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PIERCE ROAD?

PIERCE ROAD in Union, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PIERCE ROAD inspected?

PIERCE ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 946 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PIERCE ROAD is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PIERCE ROAD?

PIERCE ROAD has an NBI inventory load rating of 17.8 metric tons.

Who is responsible for maintaining PIERCE ROAD?

PIERCE ROAD is owned and maintained by County Highway Agency.

How old is PIERCE ROAD and does age affect safety?

PIERCE ROAD was built in 1978, making it 48 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.