FHWA NBI 2024 Inspection record Public-domain dataset

COUNTY RD 145

Carrying COUNTY RD 145 over DANIEL CREEK/STEIN SMITH

001 MI EAST CO RD 55, Coos, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
38 t Inventory load rating

Bridge Snapshot: COUNTY RD 145

The COUNTY RD 145 bridge in Coos, Oregon carries COUNTY RD 145 over DANIEL CREEK/STEIN SMITH. It was built in 1987, making it 39 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 39.9 meters (131 feet) end to end. Daily traffic averages 202 vehicles, placing it in the lower-traffic tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 5/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 38.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How COUNTY RD 145 compares

▲ 5.8
Load rating vs Oregon average (32.3 t)
Top 31%
Higher load rating than 69% of Oregon bridges
254
Bridges in Coos · 8 in Poor condition
COUNTY RD 145 38.1 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
70.6 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
21.0
Essentiality /15
12.6
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
38.1 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1987
Material
Prestressed Concrete
Number of Spans
3
Structure Length
39.9 m (131 ft)
Deck Width
7.3 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
202 vehicles/day
Structure Number
16767 145 00025

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates fair at 5/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether COUNTY RD 145 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare COUNTY RD 145 against other structures in Coos and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for COUNTY RD 145?

COUNTY RD 145 in Coos, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is COUNTY RD 145 inspected?

COUNTY RD 145's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 202 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. COUNTY RD 145 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for COUNTY RD 145?

COUNTY RD 145 has an NBI inventory load rating of 38.1 metric tons.

Who is responsible for maintaining COUNTY RD 145?

COUNTY RD 145 is owned and maintained by County Highway Agency.

How old is COUNTY RD 145 and does age affect safety?

COUNTY RD 145 was built in 1987, making it 39 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.