FHWA NBI 2024 Inspection record Public-domain dataset

OAK DR

Carrying OAK DR over PANTHER CREEK

3.53 MI SW OF FM 244, Grimes, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
14 t Inventory load rating

Bridge Snapshot: OAK DR

The OAK DR bridge in Grimes, Texas carries OAK DR over PANTHER CREEK. It was built in 1990, making it 36 years old today. The structure is built primarily of steel continuous and spans 2 sections, stretching 22.9 meters (75 feet) end to end. Daily traffic averages 50 vehicles, placing it in the lower-traffic tier of Texas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 13.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How OAK DR compares

▼ 14.7
Load rating vs Texas average (28.3 t)
Bottom 1%
Lower load rating than 99% of Texas bridges
245
Bridges in Grimes · 3 in Poor condition
OAK DR 13.6 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
58.9 / 100 - historical 50–79.9 band
Structural adequacy /55
28.5
Serviceability /30
24.0
Essentiality /15
14.4
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
13.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1990
Material
Steel Continuous
Number of Spans
2
Structure Length
22.9 m (75 ft)
Deck Width
5.9 m (19 ft)
Owner
County Highway Agency
Avg Daily Traffic
50 vehicles/day
Structure Number
170940AA0111002

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether OAK DR is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OAK DR against other structures in Grimes and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OAK DR?

OAK DR in Grimes, Texas has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is OAK DR inspected?

OAK DR's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 50 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OAK DR is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OAK DR?

OAK DR has an NBI inventory load rating of 13.6 metric tons.

Who is responsible for maintaining OAK DR?

OAK DR is owned and maintained by County Highway Agency.

How old is OAK DR and does age affect safety?

OAK DR was built in 1990, making it 36 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.