FHWA NBI 2024 Inspection record Public-domain dataset

OR 217

Carrying OR 217 over Tri-Met LRT

OR 217 at MP 0.92, Washington, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
69 t Inventory load rating

Bridge Snapshot: OR 217

The OR 217 bridge in Washington, Oregon carries OR 217 over Tri-Met LRT. It was built in 1994, making it 32 years old today. The structure is built primarily of concrete and spans 1 section, stretching 9.8 meters (32 feet) end to end. Daily traffic averages 93,867 vehicles, placing it in the heavily-trafficked tier of Oregon bridges. It is owned and maintained by Other Local Agencies.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 69.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How OR 217 compares

▲ 36.7
Load rating vs Oregon average (32.3 t)
Top 3%
Higher load rating than 97% of Oregon bridges
326
Bridges in Washington · 7 in Poor condition
OR 217 69.0 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
94.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
26.0
Essentiality /15
15.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
69.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1994
Material
Concrete
Number of Spans
1
Structure Length
9.8 m (32 ft)
Deck Width
48.8 m (160 ft)
Owner
Other Local Agencies
Avg Daily Traffic
93,867 vehicles/day
Structure Number
17303 000 00000

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether OR 217 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OR 217 against other structures in Washington and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OR 217?

OR 217 in Washington, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is OR 217 inspected?

OR 217's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 93,867 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OR 217 is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OR 217?

OR 217 has an NBI inventory load rating of 69.0 metric tons.

Who is responsible for maintaining OR 217?

OR 217 is owned and maintained by Other Local Agencies.

How old is OR 217 and does age affect safety?

OR 217 was built in 1994, making it 32 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.