FHWA NBI 2024 Inspection record Public-domain dataset

ELDORADO PKWY WB

Carrying ELDORADO PKWY WB over WILSON CREEK

0.25 MI W OF SH 5, Collin, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
25 t Inventory load rating

Bridge Snapshot: ELDORADO PKWY WB

The ELDORADO PKWY WB bridge in Collin, Texas carries ELDORADO PKWY WB over WILSON CREEK. It was built in 1988, making it 38 years old today. The structure is built primarily of prestressed concrete and spans 16 sections, stretching 365.8 meters (1200 feet) end to end. Daily traffic averages 14,532 vehicles, placing it in the heavily-trafficked tier of Texas bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 24.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ELDORADO PKWY WB compares

▼ 3.8
Load rating vs Texas average (28.3 t)
Bottom 29%
Lower load rating than 71% of Texas bridges
1,127
Bridges in Collin · 1 in Poor condition
ELDORADO PKWY WB 24.5 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
68.8 / 100 - historical 50–79.9 band
Structural adequacy /55
47.8
Serviceability /30
11.0
Essentiality /15
12.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1988
Material
Prestressed Concrete
Number of Spans
16
Structure Length
365.8 m (1200 ft)
Deck Width
11.9 m (39 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
14,532 vehicles/day
Structure Number
180430D00347001

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether ELDORADO PKWY WB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ELDORADO PKWY WB against other structures in Collin and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ELDORADO PKWY WB?

ELDORADO PKWY WB in Collin, Texas has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is ELDORADO PKWY WB inspected?

ELDORADO PKWY WB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 14,532 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ELDORADO PKWY WB is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ELDORADO PKWY WB?

ELDORADO PKWY WB has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining ELDORADO PKWY WB?

ELDORADO PKWY WB is owned and maintained by City/Municipal Highway Agency.

How old is ELDORADO PKWY WB and does age affect safety?

ELDORADO PKWY WB was built in 1988, making it 38 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.