FHWA NBI 2024 Inspection record Public-domain dataset

SHADY TRAIL

Carrying SHADY TRAIL over DANIELS CREEK

0.2 MI N OF WALNUT HILL L, Dallas, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
25 t Inventory load rating

Bridge Snapshot: SHADY TRAIL

The SHADY TRAIL bridge in Dallas, Texas carries SHADY TRAIL over DANIELS CREEK. It was built in 1969, making it 57 years old today. The structure is built primarily of concrete continuous and spans 3 sections, stretching 24.4 meters (80 feet) end to end. Daily traffic averages 2,892 vehicles, placing it in the moderately-trafficked tier of Texas bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 24.5 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SHADY TRAIL compares

▼ 3.8
Load rating vs Texas average (28.3 t)
Bottom 29%
Lower load rating than 71% of Texas bridges
3,231
Bridges in Dallas · 18 in Poor condition
SHADY TRAIL 24.5 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
89.5 / 100 - historical 80–100 band
Structural adequacy /55
47.8
Serviceability /30
30.0
Essentiality /15
14.7
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1969
Material
Concrete Continuous
Number of Spans
3
Structure Length
24.4 m (80 ft)
Deck Width
16.4 m (54 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
2,892 vehicles/day
Structure Number
1805709S3000001

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether SHADY TRAIL is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SHADY TRAIL against other structures in Dallas and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SHADY TRAIL?

SHADY TRAIL in Dallas, Texas has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is SHADY TRAIL inspected?

SHADY TRAIL's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 2,892 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SHADY TRAIL is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SHADY TRAIL?

SHADY TRAIL has an NBI inventory load rating of 24.5 metric tons.

Who is responsible for maintaining SHADY TRAIL?

SHADY TRAIL is owned and maintained by City/Municipal Highway Agency.

How old is SHADY TRAIL and does age affect safety?

SHADY TRAIL was built in 1969, making it 57 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.