FHWA NBI 2026 Inspection record Public-domain dataset

VALWOOD PARKWAY

Carrying VALWOOD PARKWAY over COOKS BRANCH

0.1 MI W OF JOSEY LANE, Dallas, Texas

FHWA NBI inspection record for this structure. Condition ratings, inventory load rating, span, deck width, and average daily traffic refresh annually with each NBI release.

Good
25 t Inventory load rating

Bridge Snapshot: VALWOOD PARKWAY

The VALWOOD PARKWAY bridge in Dallas, Texas carries VALWOOD PARKWAY over COOKS BRANCH. It was built in 1986, making it 40 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 14.6 meters (48 feet) end to end. Daily traffic averages 17,000 vehicles, placing it in the heavily-trafficked tier of Texas bridges. It is owned and maintained by City/Municipal Highway Agency, the entity responsible for routine inspections and any needed repairs.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9 on the 0–9 NBI scale, where 9 is excellent and 0 is failed. The weakest component sits in good condition, which drives the overall status of this bridge. No major component scores in the poor range, so the bridge is not classified as structurally deficient under federal criteria. Its NBI inventory load rating is 24.5 metric tons — the load level the structure is rated to carry at inventory (long-term) level.

In a county that maintains hundreds of NBI-tracked bridges, VALWOOD PARKWAY is one data point in a Texas inventory that FHWA inspects on a two-year cycle (more often when ratings fall). Bridge age alone is not a reliable safety signal — a 40-era structure can outperform a newer one when maintenance is consistent, materials are sound, and traffic loads stay within design limits. Use the condition ratings above, the sufficiency score, and the structurally-deficient flag together to read the bridge's real status, and check the linked county and state pages to see how this bridge ranks against its peers.

Every figure on this page comes directly from the Federal Highway Administration National Bridge Inventory (NBI), the public dataset that catalogs more than 617,000 highway bridges across the United States and is updated annually from the records that each state Department of Transportation submits to the FHWA. The condition codes use the standardized FHWA Recording and Coding Guide, the same scale that determines federal eligibility for the Highway Bridge Program and the Surface Transportation Block Grant set-aside for off-system bridges. A "structurally deficient" classification under those federal criteria is a maintenance and funding flag, never a closure order; states keep deficient bridges open with load posting, weight limits, or accelerated inspection cycles until rehabilitation or replacement is funded. See our methodology for refresh cadence and the exact NBI release vintage powering each record.

How VALWOOD PARKWAY compares

▼ 3.8
Load rating vs Texas average (28.3 t)
Bottom 29%
Lower load rating than 71% of Texas bridges
3,231
Bridges in Dallas · 18 structurally deficient
VALWOOD PARKWAY 24.5 t
Texas average 28.3 t

NBI inventory load rating (metric tons) and structural-deficiency status compared across Texas, computed live from the FHWA NBI.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
24.5 t
NBI inventory level (metric tons)
SD Status
Not SD

Ratings are on a 0–9 scale: 9 = Excellent, 7–8 = Good, 5–6 = Fair, 3–4 = Poor, 0–2 = Critical/Failed. Sufficiency rating (0–100) combines structural adequacy, functional obsolescence, and essentiality.

Structural Details

Year Built
1986
Material
Prestressed Concrete
Number of Spans
1
Structure Length
14.6 m (48 ft)
Deck Width
29.9 m (98 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
17,000 vehicles/day
Structure Number
180570G01170001

Location

0.1 MI W OF JOSEY LANE, Dallas, Texas
32.938358, -96.891897
View on Google Maps ↗

Data Source

Data from the FHWA National Bridge Inventory (NBI). Bridge inspections are required every two years by federal law. Conditions reflect the most recent inspection.

FHWA NBI Program ↗

Condition Analysis

Built in 1986, this bridge is 40 years old. It carries approximately 17,000 vehicles per day. Based on the most recent FHWA inspection:

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

Its NBI inventory load rating reflects the load level it is rated to carry.

Frequently Asked Questions

What do the condition ratings mean for VALWOOD PARKWAY?

Bridge condition ratings use a 0–9 scale set by the Federal Highway Administration (FHWA). Ratings 7–9 indicate good condition with no significant problems. Ratings 5–6 mean fair condition with minor issues. Ratings 3–4 indicate poor condition requiring repair. Ratings 0–2 are critical, meaning the bridge has serious structural problems. VALWOOD PARKWAY in Dallas, Texas has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9.

How often is VALWOOD PARKWAY inspected?

Federal law requires most highway bridges to be inspected at least every 24 months. Bridges in poor condition or with known issues may be inspected more frequently (every 12 months or less). VALWOOD PARKWAY is part of the National Bridge Inventory maintained by the FHWA. With 17,000 vehicles crossing daily, regular inspection is essential.

What does "structurally deficient" mean for a bridge?

A structurally deficient bridge has at least one major component (deck, superstructure, or substructure) rated 4 or below on the FHWA 0–9 scale. This classification does NOT mean the bridge is unsafe for travel — it means the bridge needs repair, rehabilitation, or eventual replacement. Structurally deficient bridges remain open and are monitored. VALWOOD PARKWAY is not classified as structurally deficient.

What is the inventory load rating for VALWOOD PARKWAY?

The NBI inventory rating is the load level a bridge is rated to carry for an indefinite period, recorded in metric tons. A lower number means the structure is more load-restricted. VALWOOD PARKWAY has an inventory load rating of 24.5 metric tons. It is distinct from the FHWA sufficiency rating, a separate 0–100 funding-eligibility score that this dataset does not include.

Who is responsible for maintaining VALWOOD PARKWAY?

Bridge ownership and maintenance responsibility varies — bridges may be owned by state DOTs, counties, cities, railroads, or federal agencies. VALWOOD PARKWAY is maintained by City/Municipal Highway Agency. The FHWA oversees the National Bridge Inventory program and sets inspection standards, but day-to-day maintenance falls to the owning agency. If you notice damage or safety concerns, contact your state DOT or call 911 for emergencies.

How old is VALWOOD PARKWAY and does age affect safety?

VALWOOD PARKWAY was built in 1986, making it 40 years old. Bridge age alone does not determine safety — condition depends on materials, design, traffic load, maintenance history, and environmental exposure. Many older bridges remain in good condition due to regular maintenance and reconstruction.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A structurally deficient rating does not mean a bridge is closed or unsafe for travel — it indicates the bridge requires repair or replacement. For current closure or safety information, contact your state DOT.

Related

Data sourced from official U.S. government datasets. See our methodology for details. Retrieved and formatted by PlainBridges Editorial