FHWA NBI 2024 Inspection record Public-domain dataset

COCKRELL HILL NB

Carrying COCKRELL HILL NB over BEE BRANCH

0.4 MI N OF PLEASANT RUN, Dallas, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
33 t Inventory load rating

Bridge Snapshot: COCKRELL HILL NB

The COCKRELL HILL NB bridge in Dallas, Texas carries COCKRELL HILL NB over BEE BRANCH. It was built in 2009, making it 17 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 45.7 meters (150 feet) end to end. Daily traffic averages 1,500 vehicles, placing it in the moderately-trafficked tier of Texas bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How COCKRELL HILL NB compares

▲ 4.4
Load rating vs Texas average (28.3 t)
Top 40%
Higher load rating than 60% of Texas bridges
3,231
Bridges in Dallas · 18 in Poor condition
COCKRELL HILL NB 32.7 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
97.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.0
Essentiality /15
14.8
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2009
Material
Prestressed Concrete
Number of Spans
3
Structure Length
45.7 m (150 ft)
Deck Width
13.0 m (43 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
1,500 vehicles/day
Structure Number
180570J00220007

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether COCKRELL HILL NB is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare COCKRELL HILL NB against other structures in Dallas and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for COCKRELL HILL NB?

COCKRELL HILL NB in Dallas, Texas has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is COCKRELL HILL NB inspected?

COCKRELL HILL NB's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,500 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. COCKRELL HILL NB is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for COCKRELL HILL NB?

COCKRELL HILL NB has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining COCKRELL HILL NB?

COCKRELL HILL NB is owned and maintained by City/Municipal Highway Agency.

How old is COCKRELL HILL NB and does age affect safety?

COCKRELL HILL NB was built in 2009, making it 17 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.