FHWA NBI 2024 Inspection record Public-domain dataset

IH45 SBML

Carrying IH45 SBML over LONG BRANCH CREEK

1.0 MI S OF SH 14, Navarro, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
41 t Inventory load rating

Bridge Snapshot: IH45 SBML

The IH45 SBML bridge in Navarro, Texas carries IH45 SBML over LONG BRANCH CREEK. It was built in 1968, making it 58 years old today. It was last reconstructed in 2018, extending its service life. The structure is built primarily of concrete and spans 3 sections, stretching 27.7 meters (91 feet) end to end. Daily traffic averages 16,700 vehicles, placing it in the heavily-trafficked tier of Texas bridges. It is owned and maintained by State Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 40.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How IH45 SBML compares

▲ 12.5
Load rating vs Texas average (28.3 t)
Top 6%
Higher load rating than 94% of Texas bridges
345
Bridges in Navarro · 4 in Poor condition
IH45 SBML 40.8 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
84.2 / 100 - historical 80–100 band
Structural adequacy /55
45.0
Serviceability /30
28.0
Essentiality /15
11.2
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
40.8 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1968
Last Reconstructed
2018
Material
Concrete
Number of Spans
3
Structure Length
27.7 m (91 ft)
Deck Width
17.5 m (57 ft)
Owner
State Highway Agency
Avg Daily Traffic
16,700 vehicles/day
Structure Number
181750016601065

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether IH45 SBML is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare IH45 SBML against other structures in Navarro and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for IH45 SBML?

IH45 SBML in Navarro, Texas has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is IH45 SBML inspected?

IH45 SBML's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 16,700 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. IH45 SBML is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for IH45 SBML?

IH45 SBML has an NBI inventory load rating of 40.8 metric tons.

Who is responsible for maintaining IH45 SBML?

IH45 SBML is owned and maintained by State Highway Agency.

How old is IH45 SBML and does age affect safety?

IH45 SBML was built in 1968, making it 58 years old and last reconstructed in 2018.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.