FHWA NBI 2024 Inspection record Public-domain dataset

CR NE 2010

Carrying CR NE 2010 over LITTLE RUSH CREEK

1.4 MI SE OF CR NE 2030, Navarro, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
21 t Inventory load rating

Bridge Snapshot: CR NE 2010

The CR NE 2010 bridge in Navarro, Texas carries CR NE 2010 over LITTLE RUSH CREEK. It was built in 1985, making it 41 years old today. The structure is built primarily of steel and spans 1 section, stretching 12.5 meters (41 feet) end to end. Daily traffic averages 100 vehicles, placing it in the lower-traffic tier of Texas bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 20.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR NE 2010 compares

▼ 7.4
Load rating vs Texas average (28.3 t)
Bottom 2%
Lower load rating than 98% of Texas bridges
345
Bridges in Navarro · 4 in Poor condition
CR NE 2010 20.9 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
67.3 / 100 - historical 50–79.9 band
Structural adequacy /55
42.3
Serviceability /30
13.0
Essentiality /15
15.0
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
20.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1985
Material
Steel
Number of Spans
1
Structure Length
12.5 m (41 ft)
Deck Width
4.9 m (16 ft)
Owner
County Highway Agency
Avg Daily Traffic
100 vehicles/day
Structure Number
181750AA0340002

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether CR NE 2010 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CR NE 2010 against other structures in Navarro and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR NE 2010?

CR NE 2010 in Navarro, Texas has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is CR NE 2010 inspected?

CR NE 2010's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 100 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR NE 2010 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR NE 2010?

CR NE 2010 has an NBI inventory load rating of 20.9 metric tons.

Who is responsible for maintaining CR NE 2010?

CR NE 2010 is owned and maintained by County Highway Agency.

How old is CR NE 2010 and does age affect safety?

CR NE 2010 was built in 1985, making it 41 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.