HILLIARD RD CR69
Carrying HILLIARD RD CR69 over ROCKY RIVER, VALLEY PKWY
910 FT W OF ROCKY RVR DR, Cuyahoga, Ohio
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: HILLIARD RD CR69
The HILLIARD RD CR69 bridge in Cuyahoga, Ohio carries HILLIARD RD CR69 over ROCKY RIVER, VALLEY PKWY. It was built in 1925, making it 101 years old today. It was last reconstructed in 1983, extending its service life. The structure is built primarily of concrete and spans 3 sections, stretching 272.2 meters (893 feet) end to end. Daily traffic averages 10,217 vehicles, placing it in the heavily-trafficked tier of Ohio bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show a deck rating of 4/9, superstructure at 4/9, substructure at 4/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 24.0 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How HILLIARD RD CR69 compares
Live comparison across Ohio.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1925
- Last Reconstructed
- 1983
- Material
- Concrete
- Number of Spans
- 3
- Structure Length
- 272.2 m (893 ft)
- Deck Width
- 22.9 m (75 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 10,217 vehicles/day
- Structure Number
- 1830147
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) is in poor condition (4/9), showing advanced deterioration that may require priority repair.
- • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
- • At 4/9, the substructure (piers and abutments) is in poor shape, with advanced wear flagged for priority repair.
How to read this record
HILLIARD RD CR69 is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare HILLIARD RD CR69 against other structures in Cuyahoga and across Ohio. Ohio bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for HILLIARD RD CR69?
HILLIARD RD CR69 in Cuyahoga, Ohio has a deck rating of 4/9, superstructure rating of 4/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.
How often is HILLIARD RD CR69 inspected?
HILLIARD RD CR69's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,217 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. HILLIARD RD CR69 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for HILLIARD RD CR69?
HILLIARD RD CR69 has an NBI inventory load rating of 24.0 metric tons.
Who is responsible for maintaining HILLIARD RD CR69?
HILLIARD RD CR69 is owned and maintained by County Highway Agency.
How old is HILLIARD RD CR69 and does age affect safety?
HILLIARD RD CR69 was built in 1925, making it 101 years old and last reconstructed in 1983.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.