FHWA NBI 2024 Inspection record Public-domain dataset

ENTERPRISE PARKWAY

Carrying ENTERPRISE PARKWAY over BALDWIN CREEK

700' S OF AURORA RD., Cuyahoga, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
29 t Inventory load rating

Bridge Snapshot: ENTERPRISE PARKWAY

The ENTERPRISE PARKWAY bridge in Cuyahoga, Ohio carries ENTERPRISE PARKWAY over BALDWIN CREEK. It was built in 1985, making it 41 years old today. The structure is built primarily of concrete and spans 1 section, stretching 9.8 meters (32 feet) end to end. Daily traffic averages 200 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 3/9, substructure at 6/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 29.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ENTERPRISE PARKWAY compares

▼ 8.3
Load rating vs Ohio average (37.5 t)
Bottom 19%
Lower load rating than 81% of Ohio bridges
871
Bridges in Cuyahoga · 55 in Poor condition
ENTERPRISE PARKWAY 29.2 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
49.1 / 100 - historical 20–49.9 band
Structural adequacy /55
13.1
Serviceability /30
21.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
3/9
Poor (1–4)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
29.2 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1985
Material
Concrete
Number of Spans
1
Structure Length
9.8 m (32 ft)
Deck Width
15.2 m (50 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
200 vehicles/day
Structure Number
1831006

Condition Analysis

  • At 3/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • At 3/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

ENTERPRISE PARKWAY is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare ENTERPRISE PARKWAY against other structures in Cuyahoga and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ENTERPRISE PARKWAY?

ENTERPRISE PARKWAY in Cuyahoga, Ohio has a deck rating of 3/9, superstructure rating of 3/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is ENTERPRISE PARKWAY inspected?

ENTERPRISE PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 200 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ENTERPRISE PARKWAY is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ENTERPRISE PARKWAY?

ENTERPRISE PARKWAY has an NBI inventory load rating of 29.2 metric tons.

Who is responsible for maintaining ENTERPRISE PARKWAY?

ENTERPRISE PARKWAY is owned and maintained by City/Municipal Highway Agency.

How old is ENTERPRISE PARKWAY and does age affect safety?

ENTERPRISE PARKWAY was built in 1985, making it 41 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.