FHWA NBI 2024 Inspection record Public-domain dataset

S WOODLAND CR 21

Carrying S WOODLAND CR 21 over DOAN BROOK

182 FT W. OF S. PARK DR., Cuyahoga, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
21 t Inventory load rating

Bridge Snapshot: S WOODLAND CR 21

The S WOODLAND CR 21 bridge in Cuyahoga, Ohio carries S WOODLAND CR 21 over DOAN BROOK. It was built in 1990, making it 36 years old today. The structure is built primarily of concrete and spans 1 section, stretching 9.8 meters (32 feet) end to end. Daily traffic averages 5,869 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 6/9. The weakest component sits in fair condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 20.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How S WOODLAND CR 21 compares

▼ 16.8
Load rating vs Ohio average (37.5 t)
Bottom 7%
Lower load rating than 93% of Ohio bridges
871
Bridges in Cuyahoga · 55 in Poor condition
S WOODLAND CR 21 20.7 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
63.1 / 100 - historical 50–79.9 band
Structural adequacy /55
42.0
Serviceability /30
10.0
Essentiality /15
14.1
Special reductions
−3.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
20.7 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1990
Material
Concrete
Number of Spans
1
Structure Length
9.8 m (32 ft)
Deck Width
19.8 m (65 ft)
Owner
County Highway Agency
Avg Daily Traffic
5,869 vehicles/day
Structure Number
1831968

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether S WOODLAND CR 21 is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare S WOODLAND CR 21 against other structures in Cuyahoga and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for S WOODLAND CR 21?

S WOODLAND CR 21 in Cuyahoga, Ohio has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is S WOODLAND CR 21 inspected?

S WOODLAND CR 21's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,869 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. S WOODLAND CR 21 is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for S WOODLAND CR 21?

S WOODLAND CR 21 has an NBI inventory load rating of 20.7 metric tons.

Who is responsible for maintaining S WOODLAND CR 21?

S WOODLAND CR 21 is owned and maintained by County Highway Agency.

How old is S WOODLAND CR 21 and does age affect safety?

S WOODLAND CR 21 was built in 1990, making it 36 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.