WHITNEY ROAD
Carrying WHITNEY ROAD over EAST BRANCH ROCKY RIVER
200' W OF VALLEY PKWY, Cuyahoga, Ohio
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: WHITNEY ROAD
The WHITNEY ROAD bridge in Cuyahoga, Ohio carries WHITNEY ROAD over EAST BRANCH ROCKY RIVER. It was built in 1983, making it 43 years old today. It was last reconstructed in 2024, extending its service life. The structure is built primarily of steel and spans 1 section, stretching 28.7 meters (94 feet) end to end. Daily traffic averages 500 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by City/Municipal Highway Agency.
The latest FHWA inspection records show a deck rating of 5/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 19.1 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How WHITNEY ROAD compares
Live comparison across Ohio.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 1983
- Last Reconstructed
- 2024
- Material
- Steel
- Number of Spans
- 1
- Structure Length
- 28.7 m (94 ft)
- Deck Width
- 7.1 m (23 ft)
- Owner
- City/Municipal Highway Agency
- Avg Daily Traffic
- 500 vehicles/day
- Structure Number
- 1860005
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗Condition Analysis
- • The deck (driving surface) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
- • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
- • The substructure (piers and abutments) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
How to read this record
WHITNEY ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
- Compare WHITNEY ROAD against other structures in Cuyahoga and across Ohio. Ohio bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for WHITNEY ROAD?
WHITNEY ROAD in Cuyahoga, Ohio has a deck rating of 5/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.
How often is WHITNEY ROAD inspected?
WHITNEY ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 500 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. WHITNEY ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for WHITNEY ROAD?
WHITNEY ROAD has an NBI inventory load rating of 19.1 metric tons.
Who is responsible for maintaining WHITNEY ROAD?
WHITNEY ROAD is owned and maintained by City/Municipal Highway Agency.
How old is WHITNEY ROAD and does age affect safety?
WHITNEY ROAD was built in 1983, making it 43 years old and last reconstructed in 2024.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.