FHWA NBI 2024 Inspection record Public-domain dataset

WEST 85 ST

Carrying WEST 85 ST over NS & GCRTA

S. OFF FRANKLIN AVE-W 85, Cuyahoga, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
42 t Inventory load rating

Bridge Snapshot: WEST 85 ST

The WEST 85 ST bridge in Cuyahoga, Ohio carries WEST 85 ST over NS & GCRTA. It was built in 1920, making it 106 years old today. It was last reconstructed in 1989, extending its service life. The structure is built primarily of steel continuous and spans 4 sections, stretching 39.7 meters (130 feet) end to end. Daily traffic averages 6,702 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 42.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How WEST 85 ST compares

▲ 4.9
Load rating vs Ohio average (37.5 t)
Top 26%
Higher load rating than 74% of Ohio bridges
871
Bridges in Cuyahoga · 55 in Poor condition
WEST 85 ST 42.4 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
73.7 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
7.0
Essentiality /15
13.7
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
42.4 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1920
Last Reconstructed
1989
Material
Steel Continuous
Number of Spans
4
Structure Length
39.7 m (130 ft)
Deck Width
11.9 m (39 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
6,702 vehicles/day
Structure Number
1869779

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether WEST 85 ST is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare WEST 85 ST against other structures in Cuyahoga and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for WEST 85 ST?

WEST 85 ST in Cuyahoga, Ohio has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is WEST 85 ST inspected?

WEST 85 ST's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 6,702 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. WEST 85 ST is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for WEST 85 ST?

WEST 85 ST has an NBI inventory load rating of 42.4 metric tons.

Who is responsible for maintaining WEST 85 ST?

WEST 85 ST is owned and maintained by City/Municipal Highway Agency.

How old is WEST 85 ST and does age affect safety?

WEST 85 ST was built in 1920, making it 106 years old and last reconstructed in 1989.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.