FHWA NBI 2024 Inspection record Public-domain dataset

BIG CREEK PARKWAY

Carrying BIG CREEK PARKWAY over BALDWIN CREEK

1500 FT N.OF STRONGSVILLE, Cuyahoga, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
42 t Inventory load rating

Bridge Snapshot: BIG CREEK PARKWAY

The BIG CREEK PARKWAY bridge in Cuyahoga, Ohio carries BIG CREEK PARKWAY over BALDWIN CREEK. It was built in 1999, making it 27 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 19.2 meters (63 feet) end to end. Daily traffic averages 5,000 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by Local Park/Forest/Reservation.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 42.1 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How BIG CREEK PARKWAY compares

▲ 4.6
Load rating vs Ohio average (37.5 t)
Top 31%
Higher load rating than 69% of Ohio bridges
871
Bridges in Cuyahoga · 55 in Poor condition
BIG CREEK PARKWAY 42.1 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
81.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
15.0
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
42.1 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1999
Material
Prestressed Concrete
Number of Spans
1
Structure Length
19.2 m (63 ft)
Deck Width
15.2 m (50 ft)
Owner
Local Park/Forest/Reservation
Avg Daily Traffic
5,000 vehicles/day
Structure Number
1890417

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (7/9), showing no significant deterioration.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether BIG CREEK PARKWAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare BIG CREEK PARKWAY against other structures in Cuyahoga and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for BIG CREEK PARKWAY?

BIG CREEK PARKWAY in Cuyahoga, Ohio has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is BIG CREEK PARKWAY inspected?

BIG CREEK PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. BIG CREEK PARKWAY is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for BIG CREEK PARKWAY?

BIG CREEK PARKWAY has an NBI inventory load rating of 42.1 metric tons.

Who is responsible for maintaining BIG CREEK PARKWAY?

BIG CREEK PARKWAY is owned and maintained by Local Park/Forest/Reservation.

How old is BIG CREEK PARKWAY and does age affect safety?

BIG CREEK PARKWAY was built in 1999, making it 27 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.