FHWA NBI 2024 Inspection record Public-domain dataset

Valley Parkway

Carrying Valley Parkway over East Branch Rocky River

500 ft S. Spafford Rd, Cuyahoga, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
32 t Inventory load rating

Bridge Snapshot: Valley Parkway

The Valley Parkway bridge in Cuyahoga, Ohio carries Valley Parkway over East Branch Rocky River. It was built in 1998, making it 28 years old today. The structure is built primarily of concrete and spans 2 sections, stretching 16.5 meters (54 feet) end to end. Daily traffic averages 4,000 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by Local Park/Forest/Reservation.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.4 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Valley Parkway compares

▼ 5.1
Load rating vs Ohio average (37.5 t)
Bottom 26%
Lower load rating than 74% of Ohio bridges
871
Bridges in Cuyahoga · 55 in Poor condition
Valley Parkway 32.4 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
75.5 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
7.0
Essentiality /15
13.5
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.4 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1998
Material
Concrete
Number of Spans
2
Structure Length
16.5 m (54 ft)
Deck Width
8.5 m (28 ft)
Owner
Local Park/Forest/Reservation
Avg Daily Traffic
4,000 vehicles/day
Structure Number
1891138

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether Valley Parkway is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Valley Parkway against other structures in Cuyahoga and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Valley Parkway?

Valley Parkway in Cuyahoga, Ohio has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is Valley Parkway inspected?

Valley Parkway's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,000 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Valley Parkway is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Valley Parkway?

Valley Parkway has an NBI inventory load rating of 32.4 metric tons.

Who is responsible for maintaining Valley Parkway?

Valley Parkway is owned and maintained by Local Park/Forest/Reservation.

How old is Valley Parkway and does age affect safety?

Valley Parkway was built in 1998, making it 28 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.