FHWA NBI 2024 Inspection record Public-domain dataset

7550C

Carrying 7550C over BOGGY CREEK

3.0 E 3.1 N CORDELL, Washita, Oklahoma

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
12 t Inventory load rating

Bridge Snapshot: 7550C

The 7550C bridge in Washita, Oklahoma carries 7550C over BOGGY CREEK. It was built in 1976, making it 50 years old today. The structure is built primarily of steel and spans 1 section, stretching 12.2 meters (40 feet) end to end. Daily traffic averages 75 vehicles, placing it in the lower-traffic tier of Oklahoma bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 11.8 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How 7550C compares

▼ 20.6
Load rating vs Oklahoma average (32.4 t)
Bottom 3%
Lower load rating than 97% of Oklahoma bridges
361
Bridges in Washita · 13 in Poor condition
7550C 11.8 t
Oklahoma average 32.4 t

Live comparison across Oklahoma.

Historical Sufficiency Rating

PlainBridge-computed
41.9 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
27.0
Essentiality /15
14.9
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
11.8 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1976
Material
Steel
Number of Spans
1
Structure Length
12.2 m (40 ft)
Deck Width
6.2 m (20 ft)
Owner
County Highway Agency
Avg Daily Traffic
75 vehicles/day
Structure Number
191400000000000

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • At 4/9, the superstructure (beams and supports above the deck) is in poor shape, with advanced wear flagged for priority repair.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

7550C is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare 7550C against other structures in Washita and across Oklahoma. Oklahoma bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for 7550C?

7550C in Washita, Oklahoma has a deck rating of 6/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is 7550C inspected?

7550C's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 75 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. 7550C is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for 7550C?

7550C has an NBI inventory load rating of 11.8 metric tons.

Who is responsible for maintaining 7550C?

7550C is owned and maintained by County Highway Agency.

How old is 7550C and does age affect safety?

7550C was built in 1976, making it 50 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.