FHWA NBI 2024 Inspection record Public-domain dataset

FIRST AVE.

Carrying FIRST AVE. over NECANICUM RV

0.2 MI W OF US 101, Clatsop, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
49 t Inventory load rating

Bridge Snapshot: FIRST AVE.

The FIRST AVE. bridge in Clatsop, Oregon carries FIRST AVE. over NECANICUM RV. It was built in 2001, making it 25 years old today. The structure is built primarily of prestressed concrete and spans 3 sections, stretching 58.8 meters (193 feet) end to end. Daily traffic averages 7,018 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 49.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How FIRST AVE. compares

▲ 16.7
Load rating vs Oregon average (32.3 t)
Top 13%
Higher load rating than 87% of Oregon bridges
155
Bridges in Clatsop · 5 in Poor condition
FIRST AVE. 49.0 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
79.0 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
15.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
49.0 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2001
Material
Prestressed Concrete
Number of Spans
3
Structure Length
58.8 m (193 ft)
Deck Width
14.1 m (46 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
7,018 vehicles/day
Structure Number
19264 000 00000

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the superstructure (beams and supports above the deck) is in good shape and shows no significant wear.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether FIRST AVE. is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare FIRST AVE. against other structures in Clatsop and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for FIRST AVE.?

FIRST AVE. in Clatsop, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is FIRST AVE. inspected?

FIRST AVE.'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 7,018 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. FIRST AVE. is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for FIRST AVE.?

FIRST AVE. has an NBI inventory load rating of 49.0 metric tons.

Who is responsible for maintaining FIRST AVE.?

FIRST AVE. is owned and maintained by City/Municipal Highway Agency.

How old is FIRST AVE. and does age affect safety?

FIRST AVE. was built in 2001, making it 25 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.