FHWA NBI 2024 Inspection record Public-domain dataset

GREENVILLE-NASH

Carrying GREENVILLE-NASH over HENRY HANSBARGER DITCH

.5 MI E HOLANS-TAMP RD, Darke, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
47 t Inventory load rating

Bridge Snapshot: GREENVILLE-NASH

The GREENVILLE-NASH bridge in Darke, Ohio carries GREENVILLE-NASH over HENRY HANSBARGER DITCH. It was built in 2004, making it 22 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 8.8 meters (29 feet) end to end. Daily traffic averages 351 vehicles, placing it in the lower-traffic tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 8/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 46.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How GREENVILLE-NASH compares

▲ 9.2
Load rating vs Ohio average (37.5 t)
Top 19%
Higher load rating than 81% of Ohio bridges
463
Bridges in Darke · 2 in Poor condition
GREENVILLE-NASH 46.7 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
98.1 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
29.2
Essentiality /15
14.9
Special reductions
−1.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
8/9
Good (7–9)
Inventory Load Rating
46.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2004
Material
Prestressed Concrete
Number of Spans
1
Structure Length
8.8 m (29 ft)
Deck Width
8.5 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
351 vehicles/day
Structure Number
1943030

Condition Analysis

  • At 8/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in good condition (8/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether GREENVILLE-NASH is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare GREENVILLE-NASH against other structures in Darke and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GREENVILLE-NASH?

GREENVILLE-NASH in Darke, Ohio has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is GREENVILLE-NASH inspected?

GREENVILLE-NASH's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 351 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GREENVILLE-NASH is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GREENVILLE-NASH?

GREENVILLE-NASH has an NBI inventory load rating of 46.7 metric tons.

Who is responsible for maintaining GREENVILLE-NASH?

GREENVILLE-NASH is owned and maintained by County Highway Agency.

How old is GREENVILLE-NASH and does age affect safety?

GREENVILLE-NASH was built in 2004, making it 22 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.