FHWA NBI 2024 Inspection record Public-domain dataset

CAVITT STALLMAN RD

Carrying CAVITT STALLMAN RD over MINERS RAVINE

0.4 MI N OLIVE RANCH RD, Placer, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
59 t Inventory load rating

Bridge Snapshot: CAVITT STALLMAN RD

The CAVITT STALLMAN RD bridge in Placer, California carries CAVITT STALLMAN RD over MINERS RAVINE. It was built in 1979, making it 47 years old today. The structure is built primarily of concrete and spans 1 section, stretching 9.4 meters (31 feet) end to end. Daily traffic averages 4,239 vehicles, placing it in the moderately-trafficked tier of California bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 5/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 59.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CAVITT STALLMAN RD compares

▲ 27.7
Load rating vs California average (31.3 t)
Top 2%
Higher load rating than 98% of California bridges
347
Bridges in Placer · 14 in Poor condition
CAVITT STALLMAN RD 59.0 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
70.7 / 100 - historical 50–79.9 band
Structural adequacy /55
45.0
Serviceability /30
15.0
Essentiality /15
12.7
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
59.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1979
Material
Concrete
Number of Spans
1
Structure Length
9.4 m (31 ft)
Deck Width
9.8 m (32 ft)
Owner
County Highway Agency
Avg Daily Traffic
4,239 vehicles/day
Structure Number
19C0160

Condition Analysis

  • At 5/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) is in fair condition (5/9), with minor deterioration that may require routine maintenance.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

This page shows what the last federal inspection recorded, not whether CAVITT STALLMAN RD is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CAVITT STALLMAN RD against other structures in Placer and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CAVITT STALLMAN RD?

CAVITT STALLMAN RD in Placer, California has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is CAVITT STALLMAN RD inspected?

CAVITT STALLMAN RD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,239 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CAVITT STALLMAN RD is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CAVITT STALLMAN RD?

CAVITT STALLMAN RD has an NBI inventory load rating of 59.0 metric tons.

Who is responsible for maintaining CAVITT STALLMAN RD?

CAVITT STALLMAN RD is owned and maintained by County Highway Agency.

How old is CAVITT STALLMAN RD and does age affect safety?

CAVITT STALLMAN RD was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.