FHWA NBI 2024 Inspection record Public-domain dataset

ROSEVILLE PARKWAY

Carrying ROSEVILLE PARKWAY over SECRET RAVINE

EAST OF TAYLOR RD., Placer, California

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
26 t Inventory load rating

Bridge Snapshot: ROSEVILLE PARKWAY

The ROSEVILLE PARKWAY bridge in Placer, California carries ROSEVILLE PARKWAY over SECRET RAVINE. It was built in 1998, making it 28 years old today. The structure is built primarily of concrete continuous and spans 7 sections, stretching 73.8 meters (242 feet) end to end. Daily traffic averages 48,401 vehicles, placing it in the heavily-trafficked tier of California bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 5/9, superstructure at 5/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 26.2 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How ROSEVILLE PARKWAY compares

▼ 5.1
Load rating vs California average (31.3 t)
Bottom 30%
Lower load rating than 70% of California bridges
347
Bridges in Placer · 14 in Poor condition
ROSEVILLE PARKWAY 26.2 t
California average 31.3 t

Live comparison across California.

Historical Sufficiency Rating

PlainBridge-computed
80.1 / 100 - historical 80–100 band
Structural adequacy /55
40.0
Serviceability /30
28.0
Essentiality /15
12.2
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
5/9
Fair (5–6)
Superstructure
5/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
26.2 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1998
Material
Concrete Continuous
Number of Spans
7
Structure Length
73.8 m (242 ft)
Deck Width
33.8 m (111 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
48,401 vehicles/day
Structure Number
19C0231

Condition Analysis

  • The deck (driving surface) rates fair at 5/9, minor deterioration that routine maintenance should address.
  • At 5/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether ROSEVILLE PARKWAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare ROSEVILLE PARKWAY against other structures in Placer and across California. California bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for ROSEVILLE PARKWAY?

ROSEVILLE PARKWAY in Placer, California has a deck rating of 5/9, superstructure rating of 5/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is ROSEVILLE PARKWAY inspected?

ROSEVILLE PARKWAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 48,401 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. ROSEVILLE PARKWAY is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for ROSEVILLE PARKWAY?

ROSEVILLE PARKWAY has an NBI inventory load rating of 26.2 metric tons.

Who is responsible for maintaining ROSEVILLE PARKWAY?

ROSEVILLE PARKWAY is owned and maintained by City/Municipal Highway Agency.

How old is ROSEVILLE PARKWAY and does age affect safety?

ROSEVILLE PARKWAY was built in 1998, making it 28 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.