FHWA NBI 2024 Inspection record Public-domain dataset

E. PIONEER WAY

Carrying E. PIONEER WAY over DRAINAGE BASIN

EAST OF OAK HARBOR, Island, Washington

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
33 t Inventory load rating

Bridge Snapshot: E. PIONEER WAY

The E. PIONEER WAY bridge in Island, Washington carries E. PIONEER WAY over DRAINAGE BASIN. It was built in 2006, making it 20 years old today. The structure is built primarily of steel and spans 1 section, stretching 36.6 meters (120 feet) end to end. Daily traffic averages 30 vehicles, placing it in the lower-traffic tier of Washington bridges. It is owned and maintained by Army.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 32.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How E. PIONEER WAY compares

▼ 0.6
Load rating vs Washington average (33.5 t)
Top 42%
Higher load rating than 58% of Washington bridges
8
Bridges in Island
E. PIONEER WAY 32.9 t
Washington average 33.5 t

Live comparison across Washington.

Historical Sufficiency Rating

PlainBridge-computed
76.0 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
14.0
Essentiality /15
15.0
Special reductions
−8.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
32.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2006
Material
Steel
Number of Spans
1
Structure Length
36.6 m (120 ft)
Deck Width
6.0 m (20 ft)
Owner
Army
Avg Daily Traffic
30 vehicles/day
Structure Number
1WA203360

Condition Analysis

  • The deck (driving surface) rates good at 7/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates fair at 6/9, minor deterioration that routine maintenance should address.

How to read this record

This page shows what the last federal inspection recorded, not whether E. PIONEER WAY is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare E. PIONEER WAY against other structures in Island and across Washington. Washington bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for E. PIONEER WAY?

E. PIONEER WAY in Island, Washington has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is E. PIONEER WAY inspected?

E. PIONEER WAY's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 30 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. E. PIONEER WAY is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for E. PIONEER WAY?

E. PIONEER WAY has an NBI inventory load rating of 32.9 metric tons.

Who is responsible for maintaining E. PIONEER WAY?

E. PIONEER WAY is owned and maintained by Army.

How old is E. PIONEER WAY and does age affect safety?

E. PIONEER WAY was built in 2006, making it 20 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.