BALLENGER CREEK PI
Carrying BALLENGER CREEK PI over PIKE BRANCH
0.27 MI S OF CRESTWOOD BD, Frederick, Maryland
Data updated May 2026
FHWA NBI record, refreshed with each annual release.
Bridge Snapshot: BALLENGER CREEK PI
The BALLENGER CREEK PI bridge in Frederick, Maryland carries BALLENGER CREEK PI over PIKE BRANCH. It was built in 2003, making it 23 years old today. The structure is built primarily of concrete, stretching 8.4 meters (28 feet) end to end. Daily traffic averages 14,501 vehicles, placing it in the heavily-trafficked tier of Maryland bridges. It is owned and maintained by County Highway Agency.
The latest FHWA inspection records show culvert at 7/9. The weakest component sits in good condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 32.7 metric tons.
Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.
How BALLENGER CREEK PI compares
Live comparison across Maryland.
Historical Sufficiency Rating
PlainBridge-computedFHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.
Condition Ratings
Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.
Structural Details
- Year Built
- 2003
- Material
- Concrete
- Structure Length
- 8.4 m (28 ft)
- Deck Width
- 17.1 m (56 ft)
- Owner
- County Highway Agency
- Avg Daily Traffic
- 14,501 vehicles/day
- Structure Number
- 200000F-0219020
Location
Data Source
FHWA National Bridge Inventory (NBI).
FHWA NBI Program ↗How to read this record
This page shows what the last federal inspection recorded, not whether BALLENGER CREEK PI is safe to cross today. Here is how to use it.
- NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
- Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
- Compare BALLENGER CREEK PI against other structures in Frederick and across Maryland. Maryland bridges
- Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge
Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.
Frequently Asked Questions
What do the condition ratings mean for BALLENGER CREEK PI?
BALLENGER CREEK PI in Frederick, Maryland on the FHWA's 0–9 scale.
How often is BALLENGER CREEK PI inspected?
BALLENGER CREEK PI's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 14,501 vehicles per day.
What does “structurally deficient” mean in older bridge reports?
FHWA retired that reported status beginning with the 2018 archive. BALLENGER CREEK PI is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.
What is the inventory load rating for BALLENGER CREEK PI?
BALLENGER CREEK PI has an NBI inventory load rating of 32.7 metric tons.
Who is responsible for maintaining BALLENGER CREEK PI?
BALLENGER CREEK PI is owned and maintained by County Highway Agency.
How old is BALLENGER CREEK PI and does age affect safety?
BALLENGER CREEK PI was built in 2003, making it 23 years old.
Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.
Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.