FHWA NBI 2024 Inspection record Public-domain dataset

OLD COLUMBIA PIKE

Carrying OLD COLUMBIA PIKE over TIBER HUDSON BRANCH

0.01 MI E OF MAIN STREET, Howard, Maryland

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
40 t Inventory load rating

Bridge Snapshot: OLD COLUMBIA PIKE

The OLD COLUMBIA PIKE bridge in Howard, Maryland carries OLD COLUMBIA PIKE over TIBER HUDSON BRANCH. It was built in 1997, making it 29 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 15.5 meters (51 feet) end to end. Daily traffic averages 5,887 vehicles, placing it in the moderately-trafficked tier of Maryland bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 8/9, substructure at 6/9. The weakest component sits in fair condition. All reported major components score above the Poor range. Its NBI inventory load rating is 39.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How OLD COLUMBIA PIKE compares

▼ 11.2
Load rating vs Maryland average (51.1 t)
Bottom 40%
Lower load rating than 60% of Maryland bridges
310
Bridges in Howard · 18 in Poor condition
OLD COLUMBIA PIKE 39.9 t
Maryland average 51.1 t

Live comparison across Maryland.

Historical Sufficiency Rating

PlainBridge-computed
80.3 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
14.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
6/9
Fair (5–6)
Inventory Load Rating
39.9 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1997
Material
Prestressed Concrete
Number of Spans
1
Structure Length
15.5 m (51 ft)
Deck Width
22.6 m (74 ft)
Owner
County Highway Agency
Avg Daily Traffic
5,887 vehicles/day
Structure Number
200000HO0132010

Condition Analysis

  • The deck (driving surface) is in good condition (7/9), showing no significant deterioration.
  • The superstructure (beams and supports above the deck) is in good condition (8/9), showing no significant deterioration.
  • The substructure (piers and abutments) is in fair condition (6/9), with minor deterioration that may require routine maintenance.

How to read this record

This page shows what the last federal inspection recorded, not whether OLD COLUMBIA PIKE is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare OLD COLUMBIA PIKE against other structures in Howard and across Maryland. Maryland bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for OLD COLUMBIA PIKE?

OLD COLUMBIA PIKE in Howard, Maryland has a deck rating of 7/9, superstructure rating of 8/9, and substructure rating of 6/9 on the FHWA's 0–9 scale.

How often is OLD COLUMBIA PIKE inspected?

OLD COLUMBIA PIKE's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,887 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. OLD COLUMBIA PIKE is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for OLD COLUMBIA PIKE?

OLD COLUMBIA PIKE has an NBI inventory load rating of 39.9 metric tons.

Who is responsible for maintaining OLD COLUMBIA PIKE?

OLD COLUMBIA PIKE is owned and maintained by County Highway Agency.

How old is OLD COLUMBIA PIKE and does age affect safety?

OLD COLUMBIA PIKE was built in 1997, making it 29 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.