FHWA NBI 2024 Inspection record Public-domain dataset

CHERRY LANE (WEST)

Carrying CHERRY LANE (WEST) over CSX RAILROAD

0.66 MILES WEST OF MD 197, Prince George's, Maryland

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
34 t Inventory load rating

Bridge Snapshot: CHERRY LANE (WEST)

The CHERRY LANE (WEST) bridge in Prince George's, Maryland carries CHERRY LANE (WEST) over CSX RAILROAD. It was built in 1979, making it 47 years old today. The structure is built primarily of steel continuous and spans 3 sections, stretching 60.4 meters (198 feet) end to end. Daily traffic averages 10,860 vehicles, placing it in the heavily-trafficked tier of Maryland bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 6/9, substructure at 7/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 33.6 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CHERRY LANE (WEST) compares

▼ 17.5
Load rating vs Maryland average (51.1 t)
Bottom 27%
Lower load rating than 73% of Maryland bridges
582
Bridges in Prince George's · 18 in Poor condition
CHERRY LANE (WEST) 33.6 t
Maryland average 51.1 t

Live comparison across Maryland.

Historical Sufficiency Rating

PlainBridge-computed
74.4 / 100 - historical 50–79.9 band
Structural adequacy /55
55.0
Serviceability /30
11.0
Essentiality /15
8.4
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
7/9
Good (7–9)
Inventory Load Rating
33.6 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1979
Material
Steel Continuous
Number of Spans
3
Structure Length
60.4 m (198 ft)
Deck Width
13.3 m (44 ft)
Owner
County Highway Agency
Avg Daily Traffic
10,860 vehicles/day
Structure Number
200000P-0198014

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • At 6/9, the superstructure (beams and supports above the deck) shows fair condition, with minor wear flagged for upkeep.
  • The substructure (piers and abutments) is in good condition (7/9), showing no significant deterioration.

How to read this record

This page shows what the last federal inspection recorded, not whether CHERRY LANE (WEST) is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CHERRY LANE (WEST) against other structures in Prince George's and across Maryland. Maryland bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CHERRY LANE (WEST)?

CHERRY LANE (WEST) in Prince George's, Maryland has a deck rating of 7/9, superstructure rating of 6/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CHERRY LANE (WEST) inspected?

CHERRY LANE (WEST)'s responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 10,860 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CHERRY LANE (WEST) is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CHERRY LANE (WEST)?

CHERRY LANE (WEST) has an NBI inventory load rating of 33.6 metric tons.

Who is responsible for maintaining CHERRY LANE (WEST)?

CHERRY LANE (WEST) is owned and maintained by County Highway Agency.

How old is CHERRY LANE (WEST) and does age affect safety?

CHERRY LANE (WEST) was built in 1979, making it 47 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.