FHWA NBI 2024 Inspection record Public-domain dataset

CATCHPENNY ROAD

Carrying CATCHPENNY ROAD over TERRY BRANCH

0.2 MI S OF MD RTE 349, Wicomico, Maryland

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
52 t Inventory load rating

Bridge Snapshot: CATCHPENNY ROAD

The CATCHPENNY ROAD bridge in Wicomico, Maryland carries CATCHPENNY ROAD over TERRY BRANCH. It was built in 1951, making it 75 years old today. It was last reconstructed in 1990, extending its service life. The structure is built primarily of wood or timber and spans 1 section, stretching 7.3 meters (24 feet) end to end. Daily traffic averages 435 vehicles, placing it in the lower-traffic tier of Maryland bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 6/9, substructure at 4/9. The weakest component sits in poor condition. Because at least one major component scores 4 or lower, this bridge falls in FHWA's Poor condition category. That category is not a closure order. Its NBI inventory load rating is 51.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CATCHPENNY ROAD compares

▲ 0.6
Load rating vs Maryland average (51.1 t)
Top 38%
Higher load rating than 62% of Maryland bridges
100
Bridges in Wicomico · 6 in Poor condition
CATCHPENNY ROAD 51.7 t
Maryland average 51.1 t

Live comparison across Maryland.

Historical Sufficiency Rating

PlainBridge-computed
56.1 / 100 - historical 50–79.9 band
Structural adequacy /55
30.0
Serviceability /30
13.3
Essentiality /15
14.9
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
6/9
Fair (5–6)
Substructure
4/9
Poor (1–4)
Inventory Load Rating
51.7 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1951
Last Reconstructed
1990
Material
Wood or Timber
Number of Spans
1
Structure Length
7.3 m (24 ft)
Deck Width
5.2 m (17 ft)
Owner
County Highway Agency
Avg Daily Traffic
435 vehicles/day
Structure Number
200000WI4481010

Condition Analysis

  • The deck (driving surface) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The superstructure (beams and supports above the deck) rates fair at 6/9, minor deterioration that routine maintenance should address.
  • The substructure (piers and abutments) is in poor condition (4/9), showing advanced deterioration that may require priority repair.

How to read this record

CATCHPENNY ROAD is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CATCHPENNY ROAD against other structures in Wicomico and across Maryland. Maryland bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CATCHPENNY ROAD?

CATCHPENNY ROAD in Wicomico, Maryland has a deck rating of 6/9, superstructure rating of 6/9, and substructure rating of 4/9 on the FHWA's 0–9 scale.

How often is CATCHPENNY ROAD inspected?

CATCHPENNY ROAD's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 435 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CATCHPENNY ROAD is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CATCHPENNY ROAD?

CATCHPENNY ROAD has an NBI inventory load rating of 51.7 metric tons.

Who is responsible for maintaining CATCHPENNY ROAD?

CATCHPENNY ROAD is owned and maintained by County Highway Agency.

How old is CATCHPENNY ROAD and does age affect safety?

CATCHPENNY ROAD was built in 1951, making it 75 years old and last reconstructed in 1990.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.