FHWA NBI 2024 Inspection record Public-domain dataset

CR 36

Carrying CR 36 over YELLOW CREEK

00.10 W OF CR 11, Elkhart, Indiana

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
16 t Inventory load rating

Bridge Snapshot: CR 36

The CR 36 bridge in Elkhart, Indiana carries CR 36 over YELLOW CREEK. It was built in 1971, making it 55 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 12.2 meters (40 feet) end to end. Daily traffic averages 616 vehicles, placing it in the lower-traffic tier of Indiana bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 3/9, superstructure at 3/9, substructure at 5/9. The weakest component sits in poor condition. At least one major component here scores 4 or below, which produces a Poor condition classification under FHWA's current reporting rules. Its NBI inventory load rating is 15.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CR 36 compares

▼ 19.7
Load rating vs Indiana average (35.6 t)
Bottom 4%
Lower load rating than 96% of Indiana bridges
272
Bridges in Elkhart · 17 in Poor condition
CR 36 15.9 t
Indiana average 35.6 t

Live comparison across Indiana.

Historical Sufficiency Rating

PlainBridge-computed
34.3 / 100 - historical 20–49.9 band
Structural adequacy /55
0.0
Serviceability /30
20.0
Essentiality /15
14.3
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
3/9
Poor (1–4)
Superstructure
3/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
15.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1971
Material
Prestressed Concrete
Number of Spans
1
Structure Length
12.2 m (40 ft)
Deck Width
8.6 m (28 ft)
Owner
County Highway Agency
Avg Daily Traffic
616 vehicles/day
Structure Number
2000073

Condition Analysis

  • At 3/9, the deck (driving surface) is in poor shape, with advanced wear flagged for priority repair.
  • The superstructure (beams and supports above the deck) rates poor at 3/9, advanced deterioration that should be prioritized for repair.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

CR 36 is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare CR 36 against other structures in Elkhart and across Indiana. Indiana bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CR 36?

CR 36 in Elkhart, Indiana has a deck rating of 3/9, superstructure rating of 3/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is CR 36 inspected?

CR 36's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 616 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CR 36 is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CR 36?

CR 36 has an NBI inventory load rating of 15.9 metric tons.

Who is responsible for maintaining CR 36?

CR 36 is owned and maintained by County Highway Agency.

How old is CR 36 and does age affect safety?

CR 36 was built in 1971, making it 55 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.