FHWA NBI 2024 Inspection record Public-domain dataset

PROCTER ST EXT

Carrying PROCTER ST EXT over WEST CRANE BAYOU

0.7 MI E OF SH 87, Jefferson, Texas

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
33 t Inventory load rating

Bridge Snapshot: PROCTER ST EXT

The PROCTER ST EXT bridge in Jefferson, Texas carries PROCTER ST EXT over WEST CRANE BAYOU. It was built in 1988, making it 38 years old today. The structure is built primarily of prestressed concrete and spans 2 sections, stretching 27.4 meters (90 feet) end to end. Daily traffic averages 4,125 vehicles, placing it in the moderately-trafficked tier of Texas bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 8/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 32.7 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How PROCTER ST EXT compares

▲ 4.4
Load rating vs Texas average (28.3 t)
Top 40%
Higher load rating than 60% of Texas bridges
457
Bridges in Jefferson · 6 in Poor condition
PROCTER ST EXT 32.7 t
Texas average 28.3 t

Live comparison across Texas.

Historical Sufficiency Rating

PlainBridge-computed
97.4 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.4
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
8/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
32.7 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1988
Material
Prestressed Concrete
Number of Spans
2
Structure Length
27.4 m (90 ft)
Deck Width
14.1 m (46 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
4,125 vehicles/day
Structure Number
201240C01030001

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 8/9, with no significant deterioration on file.
  • The substructure (piers and abutments) rates good at 7/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether PROCTER ST EXT is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare PROCTER ST EXT against other structures in Jefferson and across Texas. Texas bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for PROCTER ST EXT?

PROCTER ST EXT in Jefferson, Texas has a deck rating of 8/9, superstructure rating of 8/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is PROCTER ST EXT inspected?

PROCTER ST EXT's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,125 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. PROCTER ST EXT is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for PROCTER ST EXT?

PROCTER ST EXT has an NBI inventory load rating of 32.7 metric tons.

Who is responsible for maintaining PROCTER ST EXT?

PROCTER ST EXT is owned and maintained by City/Municipal Highway Agency.

How old is PROCTER ST EXT and does age affect safety?

PROCTER ST EXT was built in 1988, making it 38 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.