FHWA NBI 2024 Inspection record Public-domain dataset

CORNELIUS SCHEFLIN

Carrying CORNELIUS SCHEFLIN over Council Creek

006 MI N HWY 8, Washington, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
37 t Inventory load rating

Bridge Snapshot: CORNELIUS SCHEFLIN

The CORNELIUS SCHEFLIN bridge in Washington, Oregon carries CORNELIUS SCHEFLIN over Council Creek. It was built in 2007, making it 19 years old today. The structure is built primarily of prestressed concrete continuous and spans 2 sections, stretching 88.4 meters (290 feet) end to end. Daily traffic averages 5,234 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 36.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How CORNELIUS SCHEFLIN compares

▲ 4.6
Load rating vs Oregon average (32.3 t)
Top 33%
Higher load rating than 67% of Oregon bridges
326
Bridges in Washington · 7 in Poor condition
CORNELIUS SCHEFLIN 36.9 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
97.8 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
14.8
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
36.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2007
Material
Prestressed Concrete Continuous
Number of Spans
2
Structure Length
88.4 m (290 ft)
Deck Width
14.8 m (49 ft)
Owner
County Highway Agency
Avg Daily Traffic
5,234 vehicles/day
Structure Number
20624 132900019

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether CORNELIUS SCHEFLIN is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare CORNELIUS SCHEFLIN against other structures in Washington and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for CORNELIUS SCHEFLIN?

CORNELIUS SCHEFLIN in Washington, Oregon has a deck rating of 8/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is CORNELIUS SCHEFLIN inspected?

CORNELIUS SCHEFLIN's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 5,234 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. CORNELIUS SCHEFLIN is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for CORNELIUS SCHEFLIN?

CORNELIUS SCHEFLIN has an NBI inventory load rating of 36.9 metric tons.

Who is responsible for maintaining CORNELIUS SCHEFLIN?

CORNELIUS SCHEFLIN is owned and maintained by County Highway Agency.

How old is CORNELIUS SCHEFLIN and does age affect safety?

CORNELIUS SCHEFLIN was built in 2007, making it 19 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.