FHWA NBI 2024 Inspection record Public-domain dataset

Sequoia Parkway

Carrying Sequoia Parkway over Oregon Pacific R.R.

0.1 MI E JCT REDWOOD, Clackamas, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Good
61 t Inventory load rating

Bridge Snapshot: Sequoia Parkway

The Sequoia Parkway bridge in Clackamas, Oregon carries Sequoia Parkway over Oregon Pacific R.R.. It was built in 2014, making it 12 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 28.0 meters (92 feet) end to end. Daily traffic averages 4,686 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by City/Municipal Highway Agency.

The latest FHWA inspection records show a deck rating of 7/9, superstructure at 7/9, substructure at 7/9. The weakest component sits in good condition. None of this bridge's reported major components fall into the Poor condition range. Its NBI inventory load rating is 60.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How Sequoia Parkway compares

▲ 28.6
Load rating vs Oregon average (32.3 t)
Top 5%
Higher load rating than 95% of Oregon bridges
367
Bridges in Clackamas · 9 in Poor condition
Sequoia Parkway 60.9 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
91.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
25.0
Essentiality /15
13.0
Special reductions
−2.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
7/9
Good (7–9)
Superstructure
7/9
Good (7–9)
Substructure
7/9
Good (7–9)
Inventory Load Rating
60.9 t
NBI inventory level (metric tons)
Overall Condition
Good

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2014
Material
Prestressed Concrete
Number of Spans
1
Structure Length
28.0 m (92 ft)
Deck Width
16.5 m (54 ft)
Owner
City/Municipal Highway Agency
Avg Daily Traffic
4,686 vehicles/day
Structure Number
21937 000 00000

Condition Analysis

  • At 7/9, the deck (driving surface) is in good shape and shows no significant wear.
  • The superstructure (beams and supports above the deck) rates good at 7/9, with no significant deterioration on file.
  • At 7/9, the substructure (piers and abutments) is in good shape and shows no significant wear.

How to read this record

This page shows what the last federal inspection recorded, not whether Sequoia Parkway is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare Sequoia Parkway against other structures in Clackamas and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for Sequoia Parkway?

Sequoia Parkway in Clackamas, Oregon has a deck rating of 7/9, superstructure rating of 7/9, and substructure rating of 7/9 on the FHWA's 0–9 scale.

How often is Sequoia Parkway inspected?

Sequoia Parkway's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 4,686 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. Sequoia Parkway is currently shown as Good condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for Sequoia Parkway?

Sequoia Parkway has an NBI inventory load rating of 60.9 metric tons.

Who is responsible for maintaining Sequoia Parkway?

Sequoia Parkway is owned and maintained by City/Municipal Highway Agency.

How old is Sequoia Parkway and does age affect safety?

Sequoia Parkway was built in 2014, making it 12 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.