FHWA NBI 2024 Inspection record Public-domain dataset

SW Basalt Cr. Pkwy

Carrying SW Basalt Cr. Pkwy over PWRR

MP 0.445, Washington, Oregon

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Fair
69 t Inventory load rating

Bridge Snapshot: SW Basalt Cr. Pkwy

The SW Basalt Cr. Pkwy bridge in Washington, Oregon carries SW Basalt Cr. Pkwy over PWRR. It was built in 2015, making it 11 years old today. The structure is built primarily of prestressed concrete and spans 1 section, stretching 30.5 meters (100 feet) end to end. Daily traffic averages 1,831 vehicles, placing it in the moderately-trafficked tier of Oregon bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 8/9, superstructure at 6/9, substructure at 8/9. The weakest component sits in fair condition. No reported major component scores in the Poor range under the current federal condition thresholds. Its NBI inventory load rating is 69.0 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How SW Basalt Cr. Pkwy compares

▲ 36.7
Load rating vs Oregon average (32.3 t)
Top 3%
Higher load rating than 97% of Oregon bridges
326
Bridges in Washington · 7 in Poor condition
SW Basalt Cr. Pkwy 69.0 t
Oregon average 32.3 t

Live comparison across Oregon.

Historical Sufficiency Rating

PlainBridge-computed
80.0 / 100 - historical 80–100 band
Structural adequacy /55
55.0
Serviceability /30
30.0
Essentiality /15
0.0
Special reductions
−5.0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
8/9
Good (7–9)
Superstructure
6/9
Fair (5–6)
Substructure
8/9
Good (7–9)
Inventory Load Rating
69.0 t
NBI inventory level (metric tons)
Overall Condition
Fair

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
2015
Material
Prestressed Concrete
Number of Spans
1
Structure Length
30.5 m (100 ft)
Deck Width
26.7 m (88 ft)
Owner
County Highway Agency
Avg Daily Traffic
1,831 vehicles/day
Structure Number
22383 000 00045

Condition Analysis

  • The deck (driving surface) rates good at 8/9, with no significant deterioration on file.
  • The superstructure (beams and supports above the deck) is in fair condition (6/9), with minor deterioration that may require routine maintenance.
  • The substructure (piers and abutments) rates good at 8/9, with no significant deterioration on file.

How to read this record

This page shows what the last federal inspection recorded, not whether SW Basalt Cr. Pkwy is safe to cross today. Here is how to use it.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Learn how the 0–9 condition scale and Good/Fair/Poor categories are defined. How condition ratings work
  • Compare SW Basalt Cr. Pkwy against other structures in Washington and across Oregon. Oregon bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for SW Basalt Cr. Pkwy?

SW Basalt Cr. Pkwy in Washington, Oregon has a deck rating of 8/9, superstructure rating of 6/9, and substructure rating of 8/9 on the FHWA's 0–9 scale.

How often is SW Basalt Cr. Pkwy inspected?

SW Basalt Cr. Pkwy's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 1,831 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. SW Basalt Cr. Pkwy is currently shown as Fair condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for SW Basalt Cr. Pkwy?

SW Basalt Cr. Pkwy has an NBI inventory load rating of 69.0 metric tons.

Who is responsible for maintaining SW Basalt Cr. Pkwy?

SW Basalt Cr. Pkwy is owned and maintained by County Highway Agency.

How old is SW Basalt Cr. Pkwy and does age affect safety?

SW Basalt Cr. Pkwy was built in 2015, making it 11 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.