FHWA NBI 2024 Inspection record Public-domain dataset

GRE-22 CAMP GROUND

Carrying GRE-22 CAMP GROUND over T HOCKING RV(CAMP GROUND

0.6 MI S OF C.R. 39, Fairfield, Ohio

Data updated May 2026

FHWA NBI record, refreshed with each annual release.

Poor
26 t Inventory load rating

Bridge Snapshot: GRE-22 CAMP GROUND

The GRE-22 CAMP GROUND bridge in Fairfield, Ohio carries GRE-22 CAMP GROUND over T HOCKING RV(CAMP GROUND. It was built in 1985, making it 41 years old today. The structure is built primarily of steel and spans 1 section, stretching 7.3 meters (24 feet) end to end. Daily traffic averages 9,964 vehicles, placing it in the moderately-trafficked tier of Ohio bridges. It is owned and maintained by County Highway Agency.

The latest FHWA inspection records show a deck rating of 6/9, superstructure at 4/9, substructure at 5/9. The weakest component sits in poor condition. A component scored 4 or below, placing this bridge in the federal Poor condition category rather than declaring it unsafe or closed. Its NBI inventory load rating is 25.9 metric tons.

Sourced from the FHWA National Bridge Inventory. See our methodology for refresh cadence and NBI release vintage.

How GRE-22 CAMP GROUND compares

▼ 11.6
Load rating vs Ohio average (37.5 t)
Bottom 13%
Lower load rating than 87% of Ohio bridges
320
Bridges in Fairfield · 16 in Poor condition
GRE-22 CAMP GROUND 25.9 t
Ohio average 37.5 t

Live comparison across Ohio.

Historical Sufficiency Rating

PlainBridge-computed
42.7 / 100 - historical 20–49.9 band
Structural adequacy /55
24.6
Serviceability /30
9.0
Essentiality /15
9.1
Special reductions
0

FHWA discontinued this calculated item; it does not determine current condition, funding eligibility, posting, or closure. How the historical reference is calculated.

Condition Ratings

Deck
6/9
Fair (5–6)
Superstructure
4/9
Poor (1–4)
Substructure
5/9
Fair (5–6)
Inventory Load Rating
25.9 t
NBI inventory level (metric tons)
Overall Condition
Poor

Full 0–9 scale + sufficiency-rating breakdown: how condition ratings work.

Structural Details

Year Built
1985
Material
Steel
Number of Spans
1
Structure Length
7.3 m (24 ft)
Deck Width
7.3 m (24 ft)
Owner
County Highway Agency
Avg Daily Traffic
9,964 vehicles/day
Structure Number
2330288

Condition Analysis

  • At 6/9, the deck (driving surface) shows fair condition, with minor wear flagged for upkeep.
  • The superstructure (beams and supports above the deck) rates poor at 4/9, advanced deterioration that should be prioritized for repair.
  • At 5/9, the substructure (piers and abutments) shows fair condition, with minor wear flagged for upkeep.

How to read this record

GRE-22 CAMP GROUND is in the federal Poor condition category. That is a component-based result, not a closure order.

  • NBI condition ratings reflect the latest record in this annual dataset, not a live status. Current routine inspection intervals are risk-based.
  • Understand what Poor condition does and does not mean before drawing conclusions. Poor condition explained
  • Compare GRE-22 CAMP GROUND against other structures in Fairfield and across Ohio. Ohio bridges
  • Noticed visible damage or a safety concern? Report it to the agency that owns the bridge, or call 911 in an emergency. How to report a bridge

Condition codes come straight from the FHWA National Bridge Inventory and are not a real-time safety judgment. Only the owning agency, a state DOT, county, or other owner, can post, restrict, or close a bridge.

Frequently Asked Questions

What do the condition ratings mean for GRE-22 CAMP GROUND?

GRE-22 CAMP GROUND in Fairfield, Ohio has a deck rating of 6/9, superstructure rating of 4/9, and substructure rating of 5/9 on the FHWA's 0–9 scale.

How often is GRE-22 CAMP GROUND inspected?

GRE-22 CAMP GROUND's responsible agency sets its routine interval under FHWA's risk-based inspection rules; this page does not expose the scheduled interval. It carries about 9,964 vehicles per day.

What does “structurally deficient” mean in older bridge reports?

FHWA retired that reported status beginning with the 2018 archive. GRE-22 CAMP GROUND is currently shown as Poor condition from its component ratings; that category is not a live closure or safety decision.

What is the inventory load rating for GRE-22 CAMP GROUND?

GRE-22 CAMP GROUND has an NBI inventory load rating of 25.9 metric tons.

Who is responsible for maintaining GRE-22 CAMP GROUND?

GRE-22 CAMP GROUND is owned and maintained by County Highway Agency.

How old is GRE-22 CAMP GROUND and does age affect safety?

GRE-22 CAMP GROUND was built in 1985, making it 41 years old.

Disclaimer: Bridge condition data is from the FHWA NBI and reflects the last reported inspection. A Poor condition rating is not a live declaration that a bridge is closed or unsafe for travel. For current closure, posting, or safety information, contact the responsible transportation agency.

Data sourced from the Federal Highway Administration National Bridge Inventory. See our methodology for details. Retrieved and formatted by PlainBridges

Every figure on PlainBridge is rendered directly from federal source data, no number is typed in by an editor. This page draws directly on federal source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.